Q. Up, Up also away is a producer of kites also windsocks. Relevant data on a bottleneck operation in the shop for the upcoming fiscal yr are given in the subsequent table:
ITEM KITES WINDSOCKSDemand forecast 30,000 units/yr 12,000 units/yrLot size 20 units 70 unitsStandard processing time 0.3 hour/unit 1.0 hour/unitStandard setup time 3.0 hrs/lot 4.0 hrs/lot
The shop works two shifts per day, eight hrs per shift, 200 days per yr. There presently are four machines also a 25percent capacity cushion is desired. Explain how many machines should be purchased to meet the upcoming yr's demand without resorting to any short-term capacity solutions (e.g., working overtime or reducing capacity cushion?)
A company makes four products that have the following characteristics. The processing requirements for each product on each of the four machines are explain how in the table.
A single machine work center has 5jobs assigned to it. Using first-come-first-served priority rule, illustrate what is number of late (tardy) jobs.
Using Johnson's rule, illustrate what order should these occupation be done. Select one of the following answers.
Illustrate what type of drug testing can be d1 and when is it relevant to job. Give some specific examples that you find out in your research. Should your business have access to e-mail and ph1 mail on your business equipment.
The coffee breaks are staggered, starting at 90 min into every shift. Meal breaks also staggered starting 3.5 hrs into every shift. Create a simulation model of this system. In the simulation, draw a simple layout of the above system.
Compute labour and multifactor productivity ratio. After some study, operations manager recommends 3 options to improve business's multifactor productivity.
What concepts and constructs may you employ to study this phenomenon? How are any of aforementioned concepts and/or constructs related to explanatory hypotheses?
What is the optimal number of "Graduation Rings" Debbie should buy for the Campus Bookstore at Phoenix's University
Propose a linear goal programming model that can be employed to determine the number of each kind of facility to be constructed to best achieve the goals of Santa Ana City Parks and Recreation Department and determine the optimal facility developm..
explain how it aids in planning, Classifying also resolving specific price and schedule or quality problems associated with program.
Elucidate what do you think are the differences in determining the impact of the cost factor versus the "people" factor using the process technology approach.
Illustrate what do you think is more important for a good IT professional: strong technical skills or strong people skills.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd