Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Draw block diagrams of the unit operations necessary to treat the following wastes to effluent levels of BOD5 = 200 mg/L, SS = 100 mg/L, P = 5 mg / L (required for discharge into a sanitary sewer). Assume all BOD is due to dissolved chemicals, and that all SS are inert.
BOD Suspended Solids Phosphorus
Waste (mg / L) (SS, mg / L) (mg / L)
Chemical Industry 40,000 0 0
Pickle Cannery 0 300 1
Fertilizer Mfg. 300 300 200
A water-filled U-tube manometer is used to measure the pressure inside a tank that contains air. The water level in the U-tube on the side that connects to the tank is 5 ft above the base of the tank.
using darcy's law compute the quantity of flow, seepage velocity and contaminant loading of the river. ground water is flowing through unconfined uniform 3m thick sand aquifer and discharging to river.
To remove the solution containing metal from a part after plating the part is commonly rinsed with water. The rinse water is contaminated with metal and must be treated before discharge. The Shiny Metal Plating Co. The plating solution contains 85..
Granny viola has been saving money in the Bread and Butter mutual fund for 15 years . She has been a steady depositor over those years and has a pattern of putting $100 into the account every 3 months.
A stainless steel pipe (k= 17 W/m?C) is being used to convey heated oil. The inside surface temperature is 130?C. The pipe is 2 cm thick with an inside diameter of 8 cm. The pipe is insulated with 0.04 m thick insulation
A 400ft equal-tangent sag vertical curve has its PVC at station 200 + 00 and elevation 250ft. The initial grade is -5.0% and the final grade is +2.5%. Determine the elevation of the lowest point of the curve.
A freeway has a capacity of 4500 veh/hr. A traffic accident occurs at 9AM and the freeway is closed. At 9:15 AM, the freeway is partially opened with capacity of 1500 veh/hr. Freeway is restored to full capacity 4500 veh/hr at 9:30 am.
Draw A flow net. Show flow lines, flow Channels, and Equipotential lines. Using flow nets, please provide an estimate of seepage rate below the dam. Your submittal will provide the basis for an environmental impact statement regarding the construc..
determine the maximum wind load that the cavity wall , bothe wythes are fully grouted but unreinforced ,and type S mortar portland cement is used . prism strength is equal to 2666psi for the concrete block wythe and 5333 psi for the brick wythe.
Calculate the equilibrium concentration of dissolved oxygen in 15ºC water at 1atm and again at 2,000m elevation.
Consider a system that consists of 4 devices. The probabilities of failure for each of the devices are, respectively: 10%, 25%, 20%, and 30%. (a) If these components were in series, what is the probability that the system operates
What will the freeway's density and level of service be before and after the ban? (Assume that the trucks are removed and all other traffic attributes are unchanged).
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd