Draw a flow chart to show desalination process in your city

Assignment Help Other Engineering
Reference no: EM131731187

Water Resources and Supply Engineering Project - Water Supply System for Almizhar Area

Do parts 4 to 9 Only.

1. Executive Summary

2. Project Description and Background:

  • Water Resources in UAE.
  • The purpose of this project is to provide water supply system for Mirdif area.
  • The area covered by the project (location and size)
  • The extent of the area (as shown in the map)
  • The landuse of the area (residential, Indust., comm., ....etc)
  • The project horizon

3. Water Demand:

3.1. Water consumption rate (Per Capita Demand in litres per day per head)

3.2. Population served.

3.3. Amounts of the different types of consumption

  • Domestic or residential
  • Industrial and commercial
  • Public use (schools, parks ...etc)
  • Fire demand
  • Losses and waste

3.4. Variation in water demand

  • Average daily flow
  • Maximum daily flow
  • Peak hourly flow
  • Total daily demand

4. Water Quality (exercise)

4.1. Water Quality Guidelines (Standards)

4.2. Primary standards

4.3. Secondary Standards

4.4. Gases in water

4.5. Water sampling

4.6. Sampling Frequency

4.7. Water Testing

5. Water Treatment 

  • What is water desalination?
  • Draw a flow chart to show desalination process in your city.
  • Explain each stage and the technique used in it.
  • Define the new terminology you come across.

6. Water Storage

  • Storage Type (underground, surface, or elevated)
  • Capacity
  • Design
  • Materials

7. Water Collection and Distribution

7.1. What is the Source of water for your area? Why this source?

  • Availability
  • Accessibility
  • Cost

7.2. Intake, type, design, size, materials, location? Why?

7.3. Pumps, type, capacity, lift, and discharge? 

7.4. Intake conduit, size, length, and materials? Why?

7.5. Distribution system

  • Lay out
  • Pipes size, type, length
  • Design flow
  • Pressure
  • Appurtenances

8. References

9. Appendices (supporting Charts, layouts, tables, diagrams......etc)

Project Sample -

https://www.dropbox.com/s/ctvfryqavgivf82/Project%20Sample.rar?dl=0

Reference no: EM131731187

Questions Cloud

Identify culturally specific communication practices : Write a paper that identifies culturally specific communication practices appropriate for your specific workplace.
Discuss about the nonconstant dividends : Nonconstant Dividends. Apocalyptica Corporation is expected to pay the following dividends over the next four years: $6, $12, $17, and $3.25.
What are the four normal controls of blood pressure : What is the capillary fluid shift, including factors that influence the movement of fluid
How does the marketing mix play : What they are but how are they using them in a way that can be measured? Are they achieving their vision? What are some OPST's they are using to accomplish
Draw a flow chart to show desalination process in your city : ECV 3053 Water Resources and Supply Engineering Project - Water Supply System for Almizhar Area. Draw a flow chart to show desalination process in your city
Discuss medication orders for three patients in a clinical : Review the medication orders for three patients in a clinical setting. Identify that each order includes all essential elements for a medication order
What is the current share price : Supernormal Growth. Burton Corp. is growing quickly. Dividends are expected to grow at a rate of 25 percent for the next three years.
Explain and define the psychoanalytic psychotherapy : Compare and contrast Psychoanalytic Psychotherapy, Adlerian Psychotherapy, and Client-Centered Psychotherapy.
Discuss seventy-five percent of the administered dose : Seventy-five percent of the administered dose is excreted unchanged, the rest (25%) of the dose is metabolized

Reviews

len1731187

11/21/2017 12:43:21 AM

You are required to do parts 4 to 9 Only (highlighted in the attachment). As well as a conclusion before the references. Please find the attached to complete the requested - Also find a sample as to the format required for submission. Water Treatment - What is water desalination? Draw a flow chart to show desalination process in your city. Explain each stage and the technique used in it. Define the new terminology you come across.

Write a Review

Other Engineering Questions & Answers

  Is the voltage gain of the op amp different for each bit

From your measurements, does increase in the digital value result in increase in analog value? Please explain. Is the voltage gain of the op Amp different for each bit? Please explain why?

  Calculate the purchase cost of a shell

Integrated Design Experience Project - Aromatics from Shale Gas Transport Phenomena, CHE 306 2016 - Calculate the purchase cost of a shell and tube heat exchanger using the method given by Seider, Seader, Lewin, and Widagdo:

  Analyze the behaviour of a booster rocket

Department of Electrical & Computer Engineering - EE2023 Signal & Systems - You will analyze the behaviour of a booster rocket, and design a control system to automatically regulate the heading angle of the booster.

  What is the approximate bandwidth of the controlled system

Design a lead compensator with a gain (K) of 1 that provides a phase margin of 40o. What is the approximate bandwidth of the controlled system?

  Design a mechanism to connect the wheels to the fuselage

ASSIGNMENT - DESIGN & ANALYSIS OF A HELICOPTER LANDING GEAR. The first element is to conduct research into the geometry of a typical helicopter landing gear arrangement and design a mechanism to connect the wheels to the fuselage. You should clearl..

  Technology based on-the-job training

Create a 7- to 10-slide Microsoft® PowerPoint® presentation (including speaker's notes), using information from the Week 3 Learning Team Needs Analysis.

  Compute the matrices for the intact laminate

Determine the value of the forces Nx, Ny, Nxy, Mx, My, Mxy required to produce a curvature κx = 0.00545 mm-1, κy = -0.00486 mm-1. Neglect small numbers and shear deformation.

  Magnitudes of the components of force

Determine the magnitudes of the components of force F = 400 N acting parallel and perpendicular to segment BC of the pipe assembly.

  Calculate the total number of hours spent on each work order

You work in a company that hire and pay workers on weekly basis. At the end of each week you have to provide the total number of hours those workers spent in order to pay them. You will be provided with one Excel file at the end of each week that ..

  Circuit used to create an edge-triggered d flip-flop

To simulate the operation of a circuit used to create an edge-triggered D flip-flop. To test the operation of a 74LS74 D flip-flop and compare the operation with the predicted behavior.

  Laver-shaft assembly

Problem 1: A force, F applied to a laver-shaft assembly as shown in the figure. F = 534 N. determine the scalar component of the moment at point O about line OB and the reaction at O.

  Calculate the discharge and seepage velocities

Calculate the discharge and seepage velocities for water flowing in a pipe filled with sand, with a hydraulic conductivity of 0.02 m/day and an effective porosity of 0.25. The hydraulic gradient is 0.4. How far will the water move in one year?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd