CASE

THEATER HIGH ALTITUDE AREA DEFENSE (THAAD): FIVE FAILURES AND COUNTING (B)

It was July 2004. John West and Joy Adams had been through a lot since the THAAD program had begun in 1992. Eleven THAAD flight tests had been conducted in the Program Definition and Risk Reduction (PDRR) Phase. After six initial failures, the first successful missile to missile intercept of a ballistic missile target was achieved on June 10, 1999, during Flight Test 10. West and Adams reflected on the contract lessons they had learned.
GAO Study-June 1999

Studies conducted by both Department of Defense and independent sources identified the following underlying problems in the THAAD program:

• The program's compressed flight-test schedule did not allow for adequate ground testing, and as a result, officials could not detect problems prior to flight tests. The schedule also left insufficient time for preflight testing, post-flight analysis, and corrective action.

• The requirement to be able to quickly deploy an early prototype system diverted the contractor and government project management's attention away from the normal interceptor development process and resulted in interceptors that were not equipped with sufficient instruments to provide optimum test data.

• Quality assurance received insufficient emphasis and resources during the time of component production, resulting in unreliable components.

• The contract for developing the interceptor was a cost-plus-fixed-fee contract, a contract type that placed all of the program's financial risk on the government and did not include provisions that could be used to hold the contractor accountable for less than optimum performance. Flight-test failures had been caused primarily by manufacturing defects rather than problems with advanced technology. These failures prevented the army from demonstrating that it could reliably employ the "hit-to-kill" technology critical to THAAD's success. The restructured program addressed each of the program's four underlying problems. It

• lengthened the flight-test schedule and increased ground testing

• removed the requirement for the deployable, early prototype interceptors

• increased the contractor's quality emphasis, including its commitment, leadership, and quality assurance staffing

• modified the cost-plus-fixed-fee contract to provide performance-based incentives and penalties and introduced a degree of competition into the program.

Despite these changes, the reliability of the remaining flight-test interceptors remained a concern because most components were produced when the contractor's quality assurance system was inadequate.
Contract Performance Lessons Learned

• The THAAD PDRR missiles had not yet demonstrated any military capability. Acquiring a significant number of missiles from the current design to support a contingency deployment concept was unwise. The hardware for the remaining missiles had been built and procured several years before, and only minor changes or upgrades could be made to the existing hardware. Until new hardware was built that incorporated the necessary design changes and improved manufacturing, product assurance, and test processes, there was no reason to expect any significant improvement in the THAAD missile's performance.

• Stable program funding and guidance was essential for program success. That was especially true with a complex "cutting-edge" technology program such as THAAD. Pressures to quickly field a prototype, budget cuts, program restructuring, and the misapplication of the principles of acquisition reform all strongly influenced the programmatic decisions. The Program Management Office and contractor made tradeoffs that were necessary to meet a budget and a schedule driven by the requirement for early deployment of the User Operational Evaluation System.

• Improved component level design, qualification testing, quality control processes, and product assurance and testing procedures in the manufacturing of the interceptor were needed. Improved component level quality testing to confirm both design and reliability would greatly enhance the reliability and provide increased confidence in the integrated missile subsystems and system.

• More thorough ground and hardware-in-the-loop simulation testing of the THAAD missile assembly, and especially the seeker, needed to be performed. Due to the strong DOT&E influence, the Program Management Office had chartered a team to review the contractor and government hardware-in-the-loop testing capabilities. The team would provide recommendations on where improvements were needed to permit testing of end-to-end integrated missiles and to test critical subsystems (e.g., divert attitude control system, seeker, avionics package, etc.).
Contract Administration Lessons Learned

• A solid teaming environment (Battle Rhythm concept) early in the program life cycle, including all THAAD stakeholders (DCMA, THAAD Program Office (TPO), the prime contractor, and subcontractors) was critical to solving potential problems prior to any major milestone/funding decision points. This resulted in a proactive, solution- oriented business environment, where issues were identified with real-time resolution.

• Prime contractor DCMA Commander needed to participate actively in the Award Fee process, and THAAD stakeholders needed to participate in the Award Fee process, to address the then current program risk factors as determined by the Award Fee Board, to focus contractor risk mitigation efforts to reduce program risk, and to ensure overall mission success.

• Utilization of an electronic data management system to provide all players real-time information of all aspects of the program, from basic contract modifications to IPT minutes to program matrices, which had been paramount to the Battle Rhythm initiative success.

The THAAD program entered the engineering and manufacturing development (EMD) phase in 2000, with the award of a $3.8 billion contract to Lockheed Martin Space Systems Company. West and Adams had used the contract lessons learned and incorporated unique incentives into the EMD contract (Exhibit 1). Between 2000 and 2003, THAAD engineers reworked the entire system and fixed many of its inherent problems and redundancies. In May 2004, production of 16 flight test missiles began at Lockheed Martin's new production facilities in Pike County, Alabama. Flight testing of the EMD system was scheduled to begin in early 2005 and continue till 2009. The system was expected to enter low-rate production, to support initial operating capability (IOC) in 2007. Then in the development phase, THAAD was implementing a block development strategy designed to get the THAAD system into the hands of our soldiers as quickly as possible, using the latest technology in the most affordable manner. Each two-year block (Block 2004, 2006, and 2008) built on and integrated with the capabilities of the predecessor block. The program continued to refine and mature the system design to ensure that the element performed to an acceptable standard and could be produced efficiently and maintained. This would be accomplished by continuing current component design and development activities, robust ground tests, and quality assurance programs. Flight testing would resume in late 2004 at White Sands Missile Range, transitioning to the Pacific Missile Range Facility in Hawaii in 2006 to test against representative threat

769_1e7ef70b-4073-4531-93af-c61369599048.png

QUESTIONS

1. Do you think this was a financial audit, a project audit, or a management audit? Why?

2. Was the purpose of the audit to exert cybernetic control, go/no-go control, or post project control? Explain.

3. Given the comments in the case, do you surmise that the reason for the audit was to improve future projects or to ascertain the reasons for not meeting the project's goals, and if the latter, its direct goals or ancillary goals?

4. Do you think the GAO was the best choice for an audit team? Would it have the trust of the project personnel?

5. Given the minimal elements of a project audit present in Section 12.2, which element(s) would have been primary to the audit team? Why? Which section would have contained the "underlying problems" reported in the case

Reference no: EM131050112

Questions Cloud

Evaluating web sources given earlier : Include specifics on how to contact the agency, what services they have available, and how much these services cost. If you include WWW sources for your background research on this topic, review the guidelines about evaluating Web sources given ea..
Outline possible reasons and how you would correct problem : A high percentage of customers abandoning their orders at checkout. Outline the possible reasons as well as how you would correct the problem.
Will the new procedure do any better : Why do you think it may not have caught this particular project? Will the new procedure do any better?
Characteristics of the scientific method except : The following are characteristics of the scientific method except for: (a) the definition of the problem in specific terms
Do you think the gao was the best choice for an audit team : The program's compressed flight-test schedule did not allow for adequate ground testing, and as a result, officials could not detect problems prior to flight tests. The schedule also left insufficient time for preflight testing, post-flight analys..
Discuss this statement in class or in groups : If research in the business/management area cannot be 100% scientific is there any use in doing it?Discuss this statement in class or in groups.
What paradigm is used to define the futures price : Suppose that the one-year interest rate is 4.0 percent in the Italy, the spot exchange rate is $1.60/€, and the one-year forward exchange rate is $1.58/€. What must the one-year interest rate be in the United States?
Core hr requirements of an organization : To align the core HR requirements of an organization with its strategic plan, you will conduct an HRM review of an organization in a case study. Be creative in assembling each of the individual components or HR tools to the HRM review so that they..
Sales techniques directed at vulnerable or unaware : Imagine if you were researching sales techniques directed at vulnerable or unaware populations with regard to the sale or promotion of new pop alcohol drinks that emphasized the pop ignoring the alcohol, or of products and magazines relating to de..

Reviews

Write a Review

Basic Computer Science Questions & Answers

  What does it mean if they are public or private

When creating classes you have member functions and member variables. What are they and what data types can you use for member variables

  Analyze the role of using a computer program

Analyze why understanding the difference between both roles is important when designing and programming an application?

  What if three connections are chosen at random

Suppose we choose two connections through this combined switch at random. What is the probability that both connections can be forwarded in parallel? Hint: This is the probability that at most one of the connections crosses the link.

  Write a complete c++ program that reworks your cellular bill

Write a complete C++ program that reworks your Cellular Bill calculation program from Chapter 4. Give your source file a meaningful name, such as CellBillFun.cpp.

  Identify a recently announced security vulnerability

Write a paper on Any of the topics on cyber-crime. your task is to identify a recently announced security vulnerability and write a profile of the threat. The profile should contain the name of the threat, the systems it attacks, how it performs its ..

  Connected components in a digraph

1. Write a program to ?nd the strongly connected components in a digraph. 2. Give an algorithm that ?nds the strongly connected components in only one depth- ?rst search. Use an algorithm similar to the biconnectivity algorithm.

  In the style li b {color: blue}, b is the ____ element.

In the style li b {color: blue}, b is the ____ element.

  Describe the activity elimination strategy

Describe the activity elimination strategy and how it contributes to the analysis phase.2-3 sentences and in original content only please.

  Computer security is not an issue for organizations alone

Computer security is not an issue for organizations alone. Anyone whose personal computer is connected to a network or the Internet faces a potential risk of attack.

  What webapplication and how hardware different from software

what is a Web application? what are some features of a Web 2.0 site? how is hardware different from sofware? what are 2 of system software and how are they used? how do computers benefit individuals' health care? how does telesurgery differ from t..

  Basic forms of conducting international business

Discuss the basic forms of conducting international business, and basic international business strategies.

  Problem resolution in an organization.

In a one to two page (two page double-spaced maximum) paper explain why information systems today are currently effective or ineffective in assisting with problem resolution in an organization.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd