Discuss how the cost of engraving the model 92 fs handgun

Assignment Help Science
Reference no: EM131039773

Beretta International has established a manufacturing and assembly facility in Accokeek, MD. The Beretta USA facility produces four different handguns, one of which is the Model 92 FS 9mm handgun. For more information on Beretta International and Beretta USA, you can check out the following videos and web sites:

(1) Beretta International
https://youtu.be/IOIrVO9NAOo (brief history of Beretta)

https://www.beretta.com/beretta-today/index.aspx?m=53&did=1500 (company history)

https://www.beretta.com/code-of-ethics/index.aspx?m=53&did=40862 (code of ethics)

https://youtu.be/XR4gaEF7bo4 (Factory tour in Italy)

https://youtu.be/rM39YJNl3xw (Beretta interview in Italian - Part 1)

https://youtu.be/kHqHBmst4Y8 (Beretta interview in Italian - Part 2)

(2) Beretta USA
https://www.berettausa.com/

https://www.berettausa.com/about/default.aspx (company history)

https://youtu.be/z7s2ioXNRag (Beretta USA facility)

https://youtu.be/1dk829CQqCk (conference room)

(3) Beretta Model 92
https://en.wikipedia.org/wiki/Beretta_92 (overview)

https://www.berettaweb.com/92%20Successo/Beretta%2092%20a%20global%20success%201a.htm# (general information)

https://www.berettaweb.com/sezionati/B%20sez%2092FS.htm (exploded view)

https://youtu.be/2TAuam6D7P0 (general)

https://youtu.be/_BOMmIvMRm8 (Beretta vs Glock)

(4) Beretta Model 70
https://youtu.be/Z18bLwiOvpM (disassembly/reassembly)

(5) Glock vs Beretta
https://youtu.be/hH836XeSE9s (generic comparison)

Production of the Beretta 92FS 9mm handgun
Appendix A provides a diagram of the Model 92 FS handgun that identifies 53 parts. For the purposes of this assignment, we are assuming that only the six parts highlighted on the list are actually manufactured at the Accokeek, MD facility. All of the other parts will be assumed to be purchased from outside vendors.

The Beretta USA facility conducts the following major categories of activities in support of the manufacturing and sale of four different handgun models produced at the facility of which the Model 92 FS is one:

· Administration, including plant management, accounting and finance, human resources, marketing.
· Material delivery and storage.
· Manufacturing operations, including a chrome plating facility.
· Assembly operations.
· Testing.
· Engraving.
· Packaging, storage, and shipping.
· Limited research and development activities.

The following describes the manufacturing operations for the six parts produced at Beretta USA:

1. Part #1 - Barrel

The barrel arrives at the facility as a rectangular piece of steel from an outside vendor. The barrel goes through 11 different operations on 5 different computer-controlled machines. Once a part is placed in a machine, all operations are completed before the part is removed by the employee to be placed in the next machine. Only two employees are needed to operate all 5 machines at one time. These machines also make the barrels of the other handguns produced in the Beretta USA facility. However, 70% of the manufacturing time for all of these machines is devoted to the production of Model 92FS handgun.

Once the barrel is complete it is sent to the chroming unit, which chromes the inside of the barrel to extend the usable life of the handgun. The barrels of all of the handguns produced at the Beretta USA facility go through the chroming operation. 75% of the time expended in the chroming facility is for the Model 92 FS handgun.

Because the time it takes to complete the barrel is less than the time required to manufacture the aluminum frame, barrels may be stored until needed in assembly.

2. Part #2 - Slide

The slide arrives at the facility as a rectangular piece of steel from an outside vendor. The slide goes through 14 different operations on 6 different computer-controlled machines. Once a part is placed in a machine, all operations are completed before the part is removed by the employee to be placed in the next machine. Only three employees are needed to operate all 6 machines at one time. These machines also make the slides of the other handguns produced in the Beretta USA facility. However, 80% of the manufacturing time for all of these machines is devoted to the production of Model 92FS handgun.

Because the time it takes to complete the slide is less than the time required to manufacture the aluminum frame, slides may be stored until needed in assembly.

3. Part #3 - Extractor

The extractor arrives at the facility as a rectangular piece of steel from an outside vendor. The extractor goes through 6 different operations on 2 different computer-controlled machines. Once a part is placed in a machine, all operations are completed before the part is removed by the employee to be placed in the next machine. Only one employee is needed to operate both machines at one time. These machines also make the extractors of the other handguns produced in the Beretta USA facility. However, 70% of the manufacturing time for all of these machines is devoted to the production of Model 92FS handgun.

Because the time it takes to complete the extractor is less than the time required to manufacture the aluminum frame, extractors may be stored until needed in assembly.

4. Part #4 - Firing pin

The firing pin arrives at the facility as a rectangular piece of steel from an outside vendor. The firing pin goes through 4 different operations on 3 different computer-controlled machines. Once a part is placed in a machine, all operations are completed before the part is removed by the employee to be placed in the next machine. Only one employee is needed to operate the 3 machines at one time. These machines also make the firing pins of the other handguns produced in the Beretta USA facility. However, 75% of the manufacturing time for all of these machines is devoted to the production of Model 92FS handgun.
Because the time it takes to complete the firing pin is less than the time required to manufacture the aluminum frame, firing pins may be stored until needed in assembly.

5. Part #5 - Safety lever

The safety lever arrives at the facility as a rectangular piece of steel from an outside vendor. The safety lever goes through 9 different operations on 4 different computer-controlled machines. Once a part is placed in a machine, all operations are completed before the part is removed by the employee to be placed in the next machine. Only one employee is needed to operate all 5 machines at one time. These machines also make the safety levers of the other handguns produced in the Beretta USA facility. However, 70% of the manufacturing time for all of these machines is devoted to the production of Model 92FS handgun.
Because the time it takes to complete the safety lever is less than the time required to manufacture the aluminum frame, safety levers may be stored until needed in assembly.

6. Part #6 - Frame

The frame arrives at the facility as a solid piece of aluminum that looks like the outline of a gun from an outside vendor. The frame goes through 16 different operations on 7 different computer-controlled machines. Once a part is placed in a machine, all operations are completed before the part is removed by the employee to be placed in the next machine. Three employees are needed to operate all 7 machines at one time. These machines also make the frames of the other handguns produced in the Beretta USA facility. However, 85% of the manufacturing time for all of these machines is devoted to the production of Model 92FS handgun.
It takes the most total time to machine the aluminum frame. Approximately75% of the aluminum is machined away. This scrap aluminum is accumulated in drums and recycled. The scrap from all of the other manufactured parts is also accumulated and recycled.

Upon completion of all manufacturing and the receipt of the vendor-provided parts, the Beretta USA facility assembles the Model 92FS handgun. All handguns produced at the facility are assembled by the same employees. Approximately 80% of their time is employed in the assembly of the Model 92 FS handgun.

Upon completion of the assembly process, random samples of the Model 92FS handguns are tested. 80% of the total time used to test all of the handguns manufactured at the Beretta USA facility is used to test the Model 92 FS handguns.

A few orders require that the gun barrels be engraved. For example, the FBI Academy at Quantico, VA may order a shipment of the Model 92 FS handgun for graduating agents. Most of the agents request that their guns be engraved. This is done after testing.

Upon completion of the testing and engraving, all handguns are packaged. Most of the Model 92 FS handguns are shipped right away, but some may be stored and applied to a future order.

The Beretta USA facility conducts limited research and development. This can include exploring possible changes in the production process. Occasionally, a new type of machine may be tested in the manufacturing process. All of these activities comprise less than 1% of the total available work week.

Assignment

Beretta International is reevaluating the pricing of the Beretta Model 92 FS 9 mm handgun in the USA. The company wants to do a thorough review of the costs associated with operating the Accokeek, MD facility and the costs associated with manufacturing the Model 92 FS handgun at the facility.

1. From the perspective of Beretta International, identify the direct and indirect costs of operating the Beretta USA facility. Discuss which of these costs would be relevant to Beretta International if it wanted to measure the efficiency of the Beretta USA facility.

2. Identify the direct and indirect costs associated with the manufacture and sale of the Model 92 FS handgun, assuming the facility produces this handgun and three others.

3. Discuss how the cost of engraving the Model 92 FS handgun would affect the price charged to a customer for the order.

NOTE: You do not have to complete a numerical analysis for this assignment, but you must clearly identify all assumptions used in your written analysis.

Reference no: EM131039773

Questions Cloud

How much added workers compensation risk : Franco Chen, a production foreman for Acme Machine Company, was discussing an unusual situation with Bill Johnson, a line supervisor. "Bill, I've got a bit of a problem. That new applicant for the number 7 drill press job seems to be just the person ..
Various reimbursement methodologies : For this assignment, you will be reviewing revenue cycle management and the various reimbursement methodologies that may affect the facility's or the provider's bottom line. Complete the following:
Member countries of regional organization : Q. 1. Describe the member countries of each regional organization? Q. 2. Define the common border of member countries (Like Pakistan has a common Border with Afghanistan, Iran, China, and India)?
Service costs of employing additional checkout clerks : There are approximately 300 customers shopping in Fackert department store in mexico city between 9am and 5pm on Saturdays. When deciding how many cash registers to keep open each saturday, owner Susanna Fackert considers 2 factors; customers waiting..
Discuss how the cost of engraving the model 92 fs handgun : From the perspective of Beretta International, identify the direct and indirect costs of operating the Beretta USA facility. Discuss which of these costs would be relevant to Beretta International if it wanted to measure the efficiency of the Bere..
Training methods-role play-job rotation-mentoring : Choose a job you are familiar with and, using information in Chapter 8, design a training system for employees. Focus particularly on the training methods you wish to use: role play, job rotation, mentoring, etc. Assume that you are a consultant for ..
Training and development in small businesses : State the problem, your method of finding the answer (literature review), what you found, and your conclusions.  This is written after the paper so it is in the past tense.  No more than 250 words.
Ethical practices to prevent fraud and abuse : In your post, critique legal and ethical practices to prevent fraud and abuse. Have the practices been effective in reducing or preventing fraud and abuse? How does fraud and abuse impact the costs of healthcare?
Calculate the work done : one mole of an ideal gas is heated at a constant pressure from 0 to 200 degrees. calculate the work done

Reviews

Write a Review

Science Questions & Answers

  Three principle facets of fire protection

Define the three principle facets of fire protection, and identify the four classes of fires and the appropriate methods for extinguishing each.

  Which of the following examples describes the movement of a

1. justification that sees some aspect of the environment as valuable because it provides individuals with

  Finally describe one educational strategy to address each

select three potential mediators of the behavior of increasing fruit and vegetable intake in teenage boys. state

  The u.s. health care system and lagging life expectancy

What is the issue or quality identified? What improvements are needed? What features are identified?

  What is the areal extent of the fault block?

If the average porosity is 16 percent, the average connate water is 24 percent, and average sand thickness is 12 feet, what is the areal extent of the fault block?

  Select a critical transition point in adulthood

You will need to select a critical transition point in adulthood. Using a minimum of three articles fromt he scholarly, the student is to discuss this critical transition point to include: population impacted, special issues related to engagement ..

  How medical services or treatment should be microallocated

Paul Ramsey and James Childress are two bioethicists who have differing views on how medical services/ treatment should be microallocated. Briefly define the term microallocation. Describe the two approaches

  Epidemiology and disease control

Epidemiology and Disease Control

  The connection between neurons and neurotransmitters

What is the relationship between transmitter function and a particular disease or disorder?

  Analyze the development of t2d in the u.s

Analyze the development of T2D in the U.S

  How does the respiratory system produce the human voice

How does the respiratory system produce the human voice? How can variations in tone and pitch be accounted for? Without the voicebox, how can the respiratory system continue to contribute to the production of vocal sounds?

  Advantages and disadvantages of ppi salesforce

1. Is it time for PPI to reconsider its salesforce organization by product line 2. What are the advantages and disadvantages of PPI salesforce by product line

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd