Develop the best equipment plan for the operation

Assignment Help Civil Engineering
Reference no: EM13564913

A particular project has 650,000 cubic yards of material weighing 2600 lb/cy. your company has given you up to 10 - 657G tandem powered auger loaded scrapers to use to move the material. the 657g scrapers cost 160/ea per hour to operate and maintain. the haul road to the fill site is 1500 ft and has a total resistance of 8%. the return trip ia 2500 ft with a total resistance of 10% and includes a 2 minute flagman stop. the estimated jon efficiency is 48 min/hr. your compaction and support equipment cost $420/hr and is capable of maintaing your haul road and spreading and compacting as much material as 10 scrapers can haul. your estimators bid $1.88/cy to move material or $1222000. it will cost $15000 to move the support equip to and from the job. develop the best equipment plan for the operation and determine how much the company will gain or lose moving 650000 cubic yards.

Reference no: EM13564913

Questions Cloud

What is the efficiency of the pond : A rectangular well-mixed aeration lagoon is 60m long, 5m wide, and 2m deep. It receives 400 cubic meters/day of wastewater with a BOD5 of 336mg BOD5/L for treatment. The biodegradation rate constants for the wastewater are yield coefficient = 0.8mg V..
Determine the mass flow rate of r-134a and the cop : A refrigerator operating on the vapor-compression refrigeration cycle using refrigerant-134a as the refrigerant is considered. The temperature of the cooled space and the ambient air are at 108F and 808F, respectively. R-134a enters the compressor at..
How many vehicles per minute must the attendant process : Vehicles begin to arrive at a remote parking lot after the start of a major sporting event. They are arriving at a deterministic but time-varying rate of "3.3-0.1t" where 't' is in minutes. the parking lot attendant processes vehicles ( collects fee ..
What is the average annual mass loading of pcb from : A lake has an area of 1000 ha. The concentration of the toxicant PCB in rainfall is 100 ng/l and the average annual rainfall is 70 cm. What is the average annual mass loading of PCB from the precipitation to the lake in kg/year.
Develop the best equipment plan for the operation : A particular project has 650,000 cubic yards of material weighing 2600 lb/cy. your company has given you up to 10 - 657G tandem powered auger loaded scrapers to use to move the material. the 657g scrapers cost 160/ea per hour to operate and maintain
Evaluate the total magnetic flux through the cylinder : A long, straight wire carrying a current of 2.00 A is placedalong the axis of a cylinder or radius 0.500 m and a length of 3.00m. Determine the total magnetic flux through the cylinder
How long the contractor will have to wait before he can : A contractor brought 10,000 cubic yard of soil to site to create a ramp. The water content of the soil is 30%. According to the engineer, the soil is too wet, and should be dried to 20% water content before it can be placed and compacted. The contrac..
Find the total magnetic flux through the cylinder : A long, straight wire carrying a current of 2.00 A is placedalong the axis of a cylinder or radius 0.500 m and a length of 3.00m. Determine the total magnetic flux through the cylinder
Determine the posted speed limit to the nearest 5 mph : A building is located 19 ft from the centerline of the inside lane of a curved section of highway whose radius is 400 ft. The road is level and e = 10. Determine the posted speed limit (to the nearest 5 mph) considering the following conditions:

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate total mass of sludge dry solids generated per day

The flow rate of the treatment plant is 2,000 m3/d. a. Calculate the mass of sodium bicarbonate (NaHCO3) that would be required per day to replace the alkalinity consumed.

  Determine the slenderness ratio

Determine the slenderness ratio of a 5 m column with built in ends if its cross- section is (a) circular with a radius of 40mm and (b) 50 mm square. Use the concept of effective length.

  Rankine cycle and thermal efficiency

Determine the rate at which heat is added in the boiler, the power required to operate the pumps, the net power produced by the cycle, and the thermal efficiency.

  Determine the pressure head at the top of the dome

A closed cylindrical tank filled with water has a hemispherical dome and is connected to an inverted piping system. The liquid in the top part of the piping system has a specific gravity of 0.68.

  What are some of the parameters that would be taken

A jet on an aircraft carrier is launched by a catapult. What are some of the parameters that would be taken into account to make sure the aircraft achives a specified speed at the end of the ship

  Determine the rainfall depths to be used for storm structure

Twenty years of annual maximum rainfall depths are given below. Determine the rainfall depths to be used for storm structure design for the following annual return periods: 2, 5, 10, 25, 50, & 100 year.

  Which alternative should be selected

The cash flow of alternatives J and K is shown below. If the interest rate is 10% per year, which alternative should be selected. Perform a Present Worth analysis.

  Determine the total resultant force

in inclined circular gate with water on one side shown in the figure. determine the total resultant force acting on the gate and the total location of center pressure.

  Explain how to estimate the los at the corridor

An airport corridor is 30 ft wide. given a peak demand of 300 pedestrians per minute and an average walk speed of 3 ft/s, estimate the LOS at the corridor

  Find what was the temperature t of water evaporated

After the copper mass is added, the final temperature of the mixture is 38 degrees Celsius. By checking the mass, it is determined that 1.2 grams of water evaporated. What was the temperature T

  Concrete pier is loaded on top with a uniformly

Concrete pier is loaded on top with a uniformly distributed load of600 lbs per square foot.  Investigate the state of stressat a level of 4 ft. above the base.

  The hypothetical velocity distribution in a horizontal

the hypothetical velocity distribution in a horizontal rectangular open channel is v0.3y msnbspwhere v is the velocity

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd