1) Establish the project objectives, and make a list of your assumptions about the project;
2) Develop a work breakdown structure;
3) Prepare a list of the specific activities that need to be performed to accomplish the project objective;
4) For each activity, assign the person who will be responsible;
5) Create a network diagram that shows the sequence and dependent relationships of all the activities;
6) Estimate the duration for each activity;
7) Using a project start time of 0 (today or as you desire) and a required project deadline of May 15. Calculate the ES, EF, LS, and LF times and total slack for each activity. If your calculations result in a project schedule with negative total slack, revise the project scope and activity estimated durations to arrive at an acceptable baseline schedule for completing the project by the project deadline.
8) Determine the critical path;
9) Use the software to produce a bar chart (Gantt Chart) based on the schedule in item.
10) Use the responsibility assignments you made in item and the baseline schedule you developed in items to develop a resource requirements table (similar to Figure 6.3), for each resource, based on as-soon-as-possible (ASAP) schedule.
11) Estimate the cost for each activity using the schedule in items;
12) Determine the total budgeted cost for the project;
13) Prepare a budgeted cost by period tableand a cumulative budgeted cost (CBC) curve for the project;
14) Identify at least four risks that could jeopardize the project;
15) Create a risk assessment matrix including a response plan for each of the risks.
|
Develop aggregate production plan
: Develop Aggregate Production Plan, Master Schedule, and Materials Requirement Plans for electric fans based off the sales forecast. Be sure to include the following:
|
|
Calculate the future value of a constant income stream
: Find the present and future value of a constant income stream of $100 per year over a period of 20 years, assuming a 10% annual interest rate compounded continuously.
|
|
Find the current output of the solar cell
: A 100W CO2 laser which radiates at 1.55 x 10-6 m is directed at a solar cell. What is the current output of the solar cell?
|
|
Process of setting an organization strategy
: Take a position on the following statement: "The process of setting an organization's strategy should be the driving force in the establishment of all HR policies, programs, and practices," from Mello (2011, p. 115).
|
|
Develop a work breakdown structure
: Establish the project objectives, and make a list of your assumptions about the project; Develop a work breakdown structure
|
|
Find the simple payback period on the investment
: A Large facility has 350 two-lamp fixtures, and each fixture is using 253 Watts. Improved ballasts can save 48 W/fixture. What is the simple payback period on this investment if the cost of each new fixture is $12.0?
|
|
Performance in the hr domain
: Continuing to use the SHRM case study, students will present a second power point presentation that builds on the information from the first presentation and applies some of the additional material assigned in the class. Students will:
|
|
Explain what are tqm and iso
: What are TQM and ISO. How might TQM and ISO be used to improve an organization. What are the benefits and challenges each
|
|
Compute the entropy generated in the system
: An aluminum block with a mass of 2000 kg, cools down from an initial temperature of 200°C to the atmospheric temperature of 25°C. Determine the entropy generated in the system's universe in kJ/K.
|