Develop a comprehensive work break down structure

Assignment Help Other Engineering
Reference no: EM131391582

Construction Process Management

Introduction

Each group has to prepare a comprehensive report on the Operational Plan of a fictitious construction company. This assignment tests the students' knowledge on the following theoretical knowledge. (Sections 1 and 2)

a. Effective Management Process for the Company including Resource Management.

b. Effective Communication Channel that the Company has with Internal and External Stakeholders.

c. Company Strategy on how to Motivate the Employees.

d. Ideal Leadership Qualities that has to be possessed by the Employees.

e. Policy on Health and Safety Management within the Organization.

In addition to the above, the group should also develop a work breakdown structure for a construction project using MS Project / Primavera / Gantter / QM for Windows. The group is required to do the following analysis using any one of the mentioned software. (Section 3)

a. Calculation of critical path and critical duration for the project.

b. Calculation of the total project cost and suggest ways on how to optimize the cost.

SECTION 3: Project Planning

If your Student Number is Ending with....

You should select the project as...

0

2 Floor Villa Project

1

3 Floor Residential Apartment

2

2 Floor Commercial Building

3

2 Floor Shopping Mall with Cinema

4

Industrial Warehouse made of Steel Structure

5

2 Floor School/College Building

6

2 Floor Hospital

7

2 Floor Office Building

8

2 Floor Restaurant

9

2 Floor Hotel

The group is expected to report the following details for their respective construction project.

1. Develop a rough plan / sketch of the construction project based on the assumptions of the construction bye laws of Muscat Area. The area for each of the project can be assumed suitably as per the norms.

2. Using MS Project / Primavera / Gantter / QM for Windows Software, perform the following analysis (no manual project schedule / network diagram is permitted)

a. Identify and develop a comprehensive work break down structure of all the activities of the project

b. Assign the duration for each of the activities with proper justification

c. Link the activities with proper predecessors and successors as the case may be

d. Calculate the critical duration and identify the critical path for the project

e. Identify the resources to be utilized for each of the activities and prepare the day wise resource allocation chart

f. Identify the cost of each of the activities and obtain the total cost of the project

3. Suggest the ways on how to optimize the cost and time of the project and check the effects of optimizing on the project critical path.

Attachment:- Assignment File.rar

Reference no: EM131391582

Questions Cloud

Determine the shortest distance : If the cyclist applies the brakes only on the front wheel, determine the shortest distance in which he can stop without being thrown over the front wheel.
Is it easier to see that in the pie chart or the bar chart : Here is a bar chart summarizing the 2005 movie genres, as seen in the pie chart.- Which genre was most common?- Is it easier to see that in the pie chart or the bar chart? Explain.
Explain how you would structure a narcotics unit : Explain how you would structure a narcotics unit and the unit's primary mission, including staffing and what type of funding you would provide to this unit.
Research the background of the entire case : Research the background of the entire case, discuss the decision. Do you agree with the decision? Why or why not? Use the facts of the case and two outside references as support for your argument. This should be at least 2 pages of content.
Develop a comprehensive work break down structure : M3K221730 Construction Process Management. Using MS Project / Primavera / Gantter / QM for Windows Software, perform the following analysis (no manual project schedule / network diagram is permitted) Identify and develop a comprehensive work break ..
Determine the angular acceleration of the disk : Knowing that the coefficient of kinetic friction between the disk and the belt is 0.20 and neglecting bearing friction, determine the angular acceleration of the disk while slipping occurs.
Discuss briefly the current situation and your proposal : Government 2306- Identify your topic, discuss briefly the current situation and your proposal for improvement and present a bibliography listing the 3 primary sources.
Does the bar chart support his claim : The writer offered the bar chart below as evidence to support his claim. Does the bar chart support his claim? Explain.
Is this an appropriate display for these data : The pie chart shows the ratings assigned to 120 first-run movies released in 2005.- Is this an appropriate display for these data? Explain.- Which was the most common rating?

Reviews

len1391582

2/11/2017 7:11:38 AM

I want this engineering assignment but only section 3. Please go through it carefully and make sure the tutor can do it or no coz it got charts and all. Please tell expert to do number .9 (2 floor hotel). The report should be typed (not hand written) with a minimum of 2000 words and submitted through Turnitin only. There has to be one report per group and each report should contain the software printouts. Reports that do not contain Turnitin Report and software report will not be evaluated. Each group will be given 5 minutes to explain their work through power point presentation at the end of the semester.

Write a Review

Other Engineering Questions & Answers

  Design a stable multivibrator using two resistors

Design a 555 a stable multivibrator using 2 resistors - Ra and Rb and a capacitor C, as shown in the circuit shown below. The specifications are: C = 680pF, one of the resistors is 10k?, and a duty cycle of 65%.

  What is the voltage drop across rb

Transistors Q10, Q11, and Q13 are to be identical and must have the same gm as Q8 and Q9. Transistor Q12 is to be four times as wide as Q13. Let k1n =3k1p =180 μA/V2, and Vtn |Vtp |= 0.5 V; let all hannel lengths be equal; and let VDD =VSS =1.5 V..

  Calculate the surface area and depth of an ideal settling

1. if 8000m3d of wastewater from an industry has a bod5 of 190 mgl and k 0.17 per day base 10a. how much oxygen kgday

  Velocities at the inlet and the exit

Water enters a pump steadily at 100 kPa at a rate of 35 L/s and leaves at 800 kPa. The flow velocities at the inlet and the exit are the same, but the pump exit where the discharge pressure is measured is 6.1 m above the inlet section. The minimum..

  Create a flash movie that uses motion animation

Create a Flash movie that uses motion animation to change a figure from a large size to a small size and back as it moves from the top to the bottom of the right side of the stage

  Determine user equilibrium traffic flows

If the peak-hour traffic demand is 3400 vehicles, determine user equilibrium traffic flows.

  Compare a calculated and measured values in the table

Compare a calculated and measured values in the table. Discuss whether the values are the same of different. If they are different, provide the reasoning. And how to reduce this difference between calculated and measured values.

  Compute the extensional coupling and bending stiffness

Compute the extensional [A], coupling [B], and bending stiffness [D] matrices of a bimetallic (copper and aluminum) strip with each lamina 2 mm thick.

  Force with an equivalent force-couple system

A plumber applies a 220-N force to the handle of a wrench as she removes a coupling from the end of a pipe. Knowing that the wrench and the force lie in a vertical plane parallel to the yz plane, replace the force with an equivalent force-couple s..

  Report and the multisim design for your project

Conceptual Design: Explain the block diagram and what each block does (its functionality) and how it works. Also, be sure to explain when one might use an operational-amplifier wheatstone bridge and its advantages.

  Find the required current i and the power dissipation

It is required to design the sense amplifier of Fig. 16.24 to detect an input signal of 140 mV and provide a full output in 0.5 ns. If C = 50 fF and VDD = 1.2 V, find the required current I and the power dissipation.

  Draw a block diagram of a processor

Draw a block diagram of a processor, memory, peripheral and DMA controller connected with a systemDraw a block diagram of a processor.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd