Construction Process Management
Introduction
Each group has to prepare a comprehensive report on the Operational Plan of a fictitious construction company. This assignment tests the students' knowledge on the following theoretical knowledge. (Sections 1 and 2)
a. Effective Management Process for the Company including Resource Management.
b. Effective Communication Channel that the Company has with Internal and External Stakeholders.
c. Company Strategy on how to Motivate the Employees.
d. Ideal Leadership Qualities that has to be possessed by the Employees.
e. Policy on Health and Safety Management within the Organization.
In addition to the above, the group should also develop a work breakdown structure for a construction project using MS Project / Primavera / Gantter / QM for Windows. The group is required to do the following analysis using any one of the mentioned software. (Section 3)
a. Calculation of critical path and critical duration for the project.
b. Calculation of the total project cost and suggest ways on how to optimize the cost.
SECTION 3: Project Planning
If your Student Number is Ending with....
|
You should select the project as...
|
0
|
2 Floor Villa Project
|
1
|
3 Floor Residential Apartment
|
2
|
2 Floor Commercial Building
|
3
|
2 Floor Shopping Mall with Cinema
|
4
|
Industrial Warehouse made of Steel Structure
|
5
|
2 Floor School/College Building
|
6
|
2 Floor Hospital
|
7
|
2 Floor Office Building
|
8
|
2 Floor Restaurant
|
9
|
2 Floor Hotel
|
The group is expected to report the following details for their respective construction project.
1. Develop a rough plan / sketch of the construction project based on the assumptions of the construction bye laws of Muscat Area. The area for each of the project can be assumed suitably as per the norms.
2. Using MS Project / Primavera / Gantter / QM for Windows Software, perform the following analysis (no manual project schedule / network diagram is permitted)
a. Identify and develop a comprehensive work break down structure of all the activities of the project
b. Assign the duration for each of the activities with proper justification
c. Link the activities with proper predecessors and successors as the case may be
d. Calculate the critical duration and identify the critical path for the project
e. Identify the resources to be utilized for each of the activities and prepare the day wise resource allocation chart
f. Identify the cost of each of the activities and obtain the total cost of the project
3. Suggest the ways on how to optimize the cost and time of the project and check the effects of optimizing on the project critical path.
Attachment:- Assignment File.rar
Determine the shortest distance
: If the cyclist applies the brakes only on the front wheel, determine the shortest distance in which he can stop without being thrown over the front wheel.
|
Is it easier to see that in the pie chart or the bar chart
: Here is a bar chart summarizing the 2005 movie genres, as seen in the pie chart.- Which genre was most common?- Is it easier to see that in the pie chart or the bar chart? Explain.
|
Explain how you would structure a narcotics unit
: Explain how you would structure a narcotics unit and the unit's primary mission, including staffing and what type of funding you would provide to this unit.
|
Research the background of the entire case
: Research the background of the entire case, discuss the decision. Do you agree with the decision? Why or why not? Use the facts of the case and two outside references as support for your argument. This should be at least 2 pages of content.
|
Develop a comprehensive work break down structure
: M3K221730 Construction Process Management. Using MS Project / Primavera / Gantter / QM for Windows Software, perform the following analysis (no manual project schedule / network diagram is permitted) Identify and develop a comprehensive work break ..
|
Determine the angular acceleration of the disk
: Knowing that the coefficient of kinetic friction between the disk and the belt is 0.20 and neglecting bearing friction, determine the angular acceleration of the disk while slipping occurs.
|
Discuss briefly the current situation and your proposal
: Government 2306- Identify your topic, discuss briefly the current situation and your proposal for improvement and present a bibliography listing the 3 primary sources.
|
Does the bar chart support his claim
: The writer offered the bar chart below as evidence to support his claim. Does the bar chart support his claim? Explain.
|
Is this an appropriate display for these data
: The pie chart shows the ratings assigned to 120 first-run movies released in 2005.- Is this an appropriate display for these data? Explain.- Which was the most common rating?
|