Determine the tank depth and diameter to produce an overflow

Assignment Help Civil Engineering
Reference no: EM13563786

Design a circular radial-flow clarifier for a town with a projected population of 45,000. Assume that the wastewater flow is 400 L/capita-day. Size the system for a 2-hr detention time at average flow. Determine the tank depth and diameter to produce an overflow rate of 36 m/d for average flow.Assume standard tank dimensions to fit mechanisms made in diameters with increments of 1.0 m and depth increments of 0.5 m.

Reference no: EM13563786

Questions Cloud

What is the uniform deterministic arrival rate : A ferryboat queuing lane holds 40 vehicles. If vehicles are processed (tolls collected) at a uniform deterministic rate of 5 vehicles per minute and processing begins when the lane reaches capacity
How much power is required to maintain straight and level : If the aircraft is flying at 8,000 ft above the ground and the engine suddenly quits, how far could the aircraft glide before reaching the ground?
Determine the actual concentration for both pollutants : An industrial off gas steam must be treated for both particulates and SOx. The gas is at 1500 degrees F and 1.5 atm of pressure containing 80 mg/cubis meter of particulates and 25 mg/cubic meter of SOx. A two unit system is bring considered consistin..
Design a cyclone that has a collection efficiency between 80 : Design a cyclone that has a collection efficiency between 80% and 85% (use parcticle size distribution given below). you must assume a dpc of 4.2 microns,an inlet gas velocity of 25 m/s and a K of 15.The unit must handle 20,000 cfm of contaminated ..
Determine the tank depth and diameter to produce an overflow : Design a circular radial-flow clarifier for a town with a projected population of 45,000. Assume that the wastewater flow is 400 L/capita-day. Size the system for a 2-hr
Compute the force fa on the roller and the x- and y-componen : Three point loads 10,000, 7500 and 9000 kN act in line 5m apart near the surface of a soil mass. Calculate the vertical stress at a depth of 4m vertically below the centre (7500kN) load.
What is the minimum required temperture of the boiler : A coal fired steam power plant is to be designed for the purpose of generating electrical power for a city with a population of 60,000 residents. Based on an order-of-magnitude analysis
What is the total delay per cycle and delay per vehicle for : A left-turn movement has a maximum arrival rate of 200 veh/h. The saturation flow of this movement is 1400 veh/h. For this approach, the yellow time is 4 seconds, all red time is 2 seconds and total lost time is 3 seconds.
Determine the period and frequency of the motion : A 75-lb block is supported by the spring arrangement shown. The block is moved vertically downward from its equilibrium position and released. Knowing that the amplitude of the resulting motion is 2 in.,

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate its elongation when a load of 100n is applied

consider a cylindrical copper wire 3.0mm in diameter and 3x10^4 mm long. calculate its elongation when a load of 100N is applied. Assume that the deformation is totally elastic and its Young Modulus is 110GPa.

  Construct the unit hydrograph for the 6-hr storm

Determine the runoff rate at t = 15.0 hr from a two storm system if the first storm drops 2.0-inches starting at t = 0, and the second storm drops 5.0-incheds starting at t = 12.0 hrs.

  Define the term coefficient of permeability

How would you define the coefficient of permeability? Give typical values of the coefficient for: a) fresh cement pastes; b) hardened cement pastes; c) commonly used aggregates;

  Estimate the uniaxial compressive and tensile strengths

Estimate C and of the rock mass and estimate the uniaxial compressive and tensile strengths of the rock mass

  What is the required length of the curve

The back tangent gradient is -4 percent, the forward tangent gradient is 2 percent, and the elevation of the curve at station 48+50 must equal to at least 510ft. What is the required length of the curve?

  How much of the borrow material is required to fill the site

The material is brought from a borrow site that has yt=19.5 kn/M63 with w=16.5% and Gs=2.70 How much of the borrow material (in cubic meters) is required to fill the site  How heavy is it

  Determine the rankine earth pressure diagram

A ten-foot high wall will retain a medium dense sand backfill. Determine the Rankine earth pressure diagram and the total active force on the wall.

  Determine the normal and shear stresses

The grains of wood in the board make an angle of 20 degrees with the horizontal as shown. Determine the normal and shear stresses that act perpendicular and parallel to the grains if the board is subjected to an axial load of 250 N.(Dimensions l=3..

  What is the water elevation upstream of the flume

Design a parshall flume to handle 24mgd in a 10ft wide channel at a downstream depth of 3 ft. If the channel floor is at elevation 65.7ft, what is the water elevation upstream of the flume

  Footings for a structure are to be built beneath a basement

Footings for a structure are to be built beneath a basement slab

  Draw shear and moment diagrams for each member of frame

Structural Analysis 8th edition 4-40 draw the shear and moment diagrams for each member of the frame. Assume A is a rocker, and D is pinned.

  Calculate the maximum shear stress in each segment of rod

A steel rod to which three disks are attached is shown below. The rod is fixed against rotation at its left end, but free to rotate in a bearing at its right end. Each disk is 300mm in diameter.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd