number 9 compression bars in a column are to be lap spliced. there is no excess steel, and the bars are enclosed by a spiral of 3/8 inch diameter wire having a pitch of 3 inch. use f'c= 4000psi. determine the required length of splice
A constant head permeability test was conducted on a clean sand sample. The diameter and length of the test specimen were 10 cm and 12 cm respectively.
Calculate the largest tolerable internal crack length for a 7075-T651 aluminum alloy component that is loaded to a stress one-half of its yield strength without catastrophic fracture.
Determine the settlements when a stress of 100 kPa is applied by the building over an area of 10m × 5 m on the soil surface.
Consider an L-shaped breakwater that protects a small harbor dredged to a uniform depth of 6 m. For a 2 m high, 10 s period incident wave at the head of the breakwater having incident wave direction of 60 degrees
Footings for a structure are to be built beneath a basement slab on a clay soil at a depth of 20 ft below present ground level. The groundwater table is 15ft below the ground surface. The soil void-ratio is about 0.087.
A gas containing 80% CH4 and 20% (by mole) He is sent through a quartz diffusion tube to recover the He. 20% by weight of the original gas is recovered and its composition is 50% He.
a 10.0 inch long 10-guage wire of yellow brass (E=105 GPa) is subjected to an axial tensile force of 400 lbs. Find the normal sress and deformation in the wire. A 10-guage wire has a diameter of 2.588 mm.
one of the wells pumps at a rate of 1240 m3/day. the second well pumps at 850 m3/day.if the aquifer has a transmissivity of 2000 m2/day and a storage coefficient of 4x10^-4, when would the wells start interfering with each other.
The casting has a mass of 3 Mg. Suspended in a vertical position and initially at rest, it is given an upward speed of V mm/s in 0.3s using a crane hook H. Determine the tension in cables AC and AB during this time interval if the acceleration is ..
design a horizontal curve for a two lane road. The road has 12 ft. lanes. Due to expensive excavation, it was determined that a maximum of 34 ft. can be cleared from the roads centerline towards the inside lane to provide for stopping sight distan..
a storage tank has a diameter of 80 ft, a height of 25ft and contains oil to a height of 15ft. the suction pumps, which can handle 15000bbl/d, are started, but the safety valves are clogged and a vacuum is drawn in the tank.
If a mass of 500kg is placed centrally on the top face of the buoy, find the maximum height of its centre of gravity above the bottom of the buoy so that the buoy may remain in stable equilibrium.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd