Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A load is to be raised 20 ft by the hoisting system. Assuming Gear A is initially at rest, accelerates uniformly to a speed of 120 rpm , determine (a) the number of revolutions exected by gear A in raising the load. (b) The time required to raise the load
If the amount of heat transfer in the HE unit is 2460 kJ per kg of steam, what is the magnitude of shaft work obtained from the turbine in kW?
1.How long is the irrigation boom (in feet) from the center pivot to its farthest extent. 2.If the irrigation boom makes 4 full revolutions in a day, how many miles does the end of the boom travel in 4 days.
a concrete dam retaining water has a specific weight of concrete of 23.5kn/m3, what is the factor of safety against sliding & overturning and pressure intensity on the base if coefficient of friction is 0.45.
Groundwater moves through a sandstone porous media and is driven by a gradient of -0.05 directed at an angle of 60 degree counterclockwise from the x-axis.
given data of water softened by excess lime treatment, sketch a meq/l, calculate the softening chemicals required in pounds per million gallons, and draw a bar graph for the softened water after re-carbonation and filtration
Air can be assumed as a di-atomic ideal gas. Find the final temperature and the amount of work ( in kW) required for air compression at a rate of 100 mol/s , from an initial condition of 1 bar an 25 C to 10 bar; for the following ways.
Design a riveted end plated Connection between a beam ISHB-300 and the flange of the Column ISHB-200 to transfer a vertical factored shear of 125 kN and a factored hogging bending moment of 125kNm.Use Shop rivets of 20mm dia.
one of the wells pumps at a rate of 1240 m3/day. the second well pumps at 850 m3/day.if the aquifer has a transmissivity of 2000 m2/day and a storage coefficient of 4x10^-4, when would the wells start interfering with each other.
what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?
The average rate of flow measured in a gage at the outlet of the watershed was 30 m^3/sec. Estimate the water losses due to the combined effects of evaporation, transpiration, and infiltration due to ground water.
Ignoring both axial and shear deformations and using the unit force method, calculate the vertical displacement of joint B.
What is the SI value of absolute pressure corresponding to a vacuum pressure of -10 inches of water. Assume the location is Moscow, Idaho. What is the SI value of gage pressure corresponding to a pressure 14 psia. Assume the location is Denver, Colo..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd