Determine the length of pipe required for coliform

Assignment Help Civil Engineering
Reference no: EM13296982

A wastewater treatment plant must disinfect its effluent before discharging the wastewater to a near-by stream. The wastewater contains 4.5*105 fecal coliform colony-forming units (CFU) per liter. The maximum permissable fecal coliform concentration that may be discharged is 2,000 fecal coliform CFU/L. It is proposed that a pipe carrying the wastewater be used for disinfection process. Determine the length of pipe required if the linear velocity of the wastewater in the pipe is 0.75 m/sec. Assume that the pipe behaves as a steady-state plug-flow system and that the reaction rate constant for destruction of the fecal coliforms is 0.23 min-1.

Reference no: EM13296982

Questions Cloud

Find the final velocity of each mass : A 15.5kg object moving in the +x direction at 7.0m/s collides head-on with a 11.0kg object moving in the -x direction at 6.0m/s, Find the final velocity of each mass if the objects stick together
Determine is the flow rate typical for a bathroom faucet : Water in a household plumbing system originates at the neighborhood water main where the pressure is 480kPa, the velocity is 5m/s, and the elevation is 2.44 m. A 19 mm (3/4-in) copper service line supplies water to a two-story residence
How a nerve impulse travels : write a paragraph about how a nerve impulse travels across a synapse +neurotransmitter combines
Determine the steady-state concentration of the pollutant : A well-mixed sewage lagoon (a shallow pond) is receiving 430 m^3/d of sewage out of a sewer pipe. The lagoon has a surface area of 10 ha (hectares) and a depth of 1 m. The pollutant concentration in the raw sewage discharging into the lagoon is 18..
Determine the length of pipe required for coliform : The maximum permissable fecal coliform concentration that may be discharged is 2,000 fecal coliform CFU/L. It is proposed that a pipe carrying the wastewater be used for disinfection process.
Which topological space that we have previously encountered : Which topological space that we have previously encountered appears to be topologically equivalent to the quotient space that results from this partition?
Design a curve for the highway by computing the radius : The PI is at station 250+50, the design speed is 65mi/h, and a maximum superelevation of 0.07 ft/ft is to be used. If the central angle of the curve is 38 degrees, design a curve for the highway by computing the radius and stationing of PC and PT.
How far stream of section would expect to find uniform flow : The slope of the channel is .15% and the mannings roughness coefficient is .038. estimate the depth 100m upstream of a section where the flow depth is 2.2m using the standard step method. Approximate how far upstream of this section would you exp..
What yield on the chicago municipal bonds would make : If Treasury bonds yield 6%, and Carter's marginal income tax rate is 40%, what yield on the Chicago municipal bonds would make Carter's treasurer indifferent between the two? Answer 3.42% 3.60% 3.78% 3.97% 4.17%

Reviews

Write a Review

Civil Engineering Questions & Answers

  Shear force-bending moment diagrams

A three-span continuous beam ABCD with three equal spans supports a uniform load with intensity q. Determine all reactions of this beam and draw the shear force and bending moment diagrams labelling all critical ordinates.

  Determine what is the instrumental and statistical error

During an experiment, the depth of a water flow in a flume is measured five times by using a ruler with 1/16-in division. The results from these measurements are 4.88 in, 5.06 in, 5.03 in, 5.13 in, 4.94 in. What is the instrumental error and what ..

  Coefficient of friction-skidding resistance

Two passenger cars are traveling at 65 MPH on a highway moving in the same direction in the same lane. The cars are separated by 25 feet for every 10 MPH of their speed. The coefficient of friction (skidding resistance) between the tires and the r..

  What is your recommendation for the maximum size of coarse

What is your recommendation for the maximum size of coarse aggregate for the following situation?

  Calculate the relative compaction

A dam project specifies 97% compaction. Lab tests on the soil being used indicate that it has a maximum dry density of 1900 kg/m3 at an optimum water content of 13.2%. Field tests give the following results: Field dry density is 1790 kg/m3 and 16...

  Duplex system with no redundancy

What is the salt usage for each regeneration if the system regenerated every 10 days? What size resin tanks (diameter, height) would be required for a duplex system with no redundancy?

  Determine the minimum clearance required

A vertical curve is formed when a rural highway passes under a bridge joining a -8% grade to the horizontal grade satisfying the requirement for safe speed of 90 Km/hr . Determine the minimum clearance required betewen the highway pavement surface..

  What is the risk of constructing a harbor

What is the risk of constructing a harbor which will be unprotected from wave attack during its construction.

  Steps of dmaic abandoned

Assume that during the analyze stage an obvious solution is discovered. Should that solution be immediately implemented and the remaining steps of DMAIC abandoned?

  Determine the compression of each spring

The 75 lb block is released from rest 5 ft above the plate. Determine the compression of each spring when the block momentarily comes to rest after striking the plate.

  Determine the tangential component of the acceleration

determine the tangential component of the acceleration of the sled a) just before it reaches B, b) just after it passes C.

  Lifting granite rock from the bottom of lake

A 170 kg granite rock (ρ = 2700 kg/m 3 ) is dropped into a lake. A man dives in and tries to lift the rock. Determine how much force the man needs to apply to lift it from the bottom of the lake. Do you think he can do it?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd