Determine the evaporation rate for a reservoir if the wind

Assignment Help Civil Engineering
Reference no: EM13563853

1.Determine the evaporation rate for a reservoir if the wind speed is 40 mph and the surface temperature is 15 degrees Celsius and the overlaying temperature is 25 degrees Celsius. and the relative humidity is 30 percent

2.Using the base units of the SI system, show that Netwon's law of gravitational attraction is a dimensionally homogeneous equation which gives F in newtons. Write with words and use equations.

Reference no: EM13563853

Questions Cloud

What is the final river temperature downstream : A toothpaste factory situated on a large river disposes of a waste water containing villiamite (NaF) to the river on a continuous basis. The minimum flow in the river is 210 m3/s, and the discharge rate from the treatment plant is 12.5 m3/s.
Determine the grade of the road : The natural water of a sample taken from a soil deposit was found to be 11.5%. it has been calculated that the maximum density for the soil will be obtained when the water content reaches 21.5%. Compute how many grams of water must be added to each 1..
What total volume of this soil is required to obtain : A construction site requires 35,000 yds^3 of soil in a compacted state with a moist unit weight of 126 pcf at a water content of 14%. if the uncompacted soil currently has a unit weight of 96 pcf and water content of 14%
Determine the gravitational force acting between two spheres : Determine the gravitational force acting between two spheres that are touching each other. The mass of each sphere is 400 kg and the radius is 300mm.
Determine the evaporation rate for a reservoir if the wind : Determine the evaporation rate for a reservoir if the wind speed is 40 mph and the surface temperature is 15 degrees Celsius and the overlaying temperature is 25 degrees Celsius. and the relative humidity is 30 percent
Determine the maximum value of the average : The frame shown consists of four wooden members, ABC, DEF, BE, and CF. Knowing that each member has a 2 3 4-in. rectangular cross section and that each pin has a 12 -in. diameter, determine the maximum value of the average normal stress (a) in member..
Determine the maximum negative moment in each span : A three span continuos beam has spans of 27, 30, 27 feet, total unfactored dead loads are 2,600 pounds per linear foot, unfactored live loads are 2,000 pounds per linear foot. For load combination 1.2D + 1.6L
Plot the shear and moment diagrams for the beam : Given simply supported beam with an overhang. The beam is 12 inches wide by 24 inches deep, and the slab is 6 inches deep. use a roof live load of 20 psf, and a concrete density of 150 pdf
How much sand did he place in the drum : A truck driver used sand to soak up a 1 g spill of lindane (C6H6Cl6). He placed the contaminated soil in an open drum which then filled with 150 L of water during a rainstorm. You test the water and find a concentration of 17 M.

Reviews

Write a Review

Civil Engineering Questions & Answers

  A circular drain pipe has a radius of 375 mm it conveys

a circular drain pipe has a radius of 375 mm. it conveys water 30 ordmc from location 1 to location 2 between which

  What does the equation reduce to in steady flow

The Navier Stokes equations in the z-direction. Define what each term in the equation means. Overall, what quantity is being conserved? Under what conditions might you be justified in assuming that non-linear terms are not important?

  Rate of diameter increasing of a balloon

A balloon is being inflated at the rate of 15m^3/min. At what rate is the diameter increasing after 5 min? Assume that the diameter is zero at time zero.

  Convert the azimuths from north to bearings

convert the azimuths from north to bearings, and compute the angles, smaller than 180 degrees between successive azimuths 68o06'42", 133o15'56", 217o44'05", 320o35'18"

  What volume of leachate is being added to the river each day

A landfill is located 500 km from a river whose surface elevation is 40 m lower than the ground elevation at the landfill. After several years it is discovered that leachate from the landfill, with a COD of 1300 mg/L, is leaking into the river.

  Estimate the excess pore pressure distribution in clay layer

The project involved rapidly placing 5 m of fill over a large area that applied a stress of 100 kPa to the underlying soil. It was initially expected that after 2 years consolidation would be complete.

  Find the absolute value of the magnitude of force vector

Find the absolute value of the magnitude of force vector B if the resultant force= 1000 lb, force vector A= 1000 lb, and the resultant forms a 45 degree angle with B, and vector B runs parallel to the y axis.

  What amount will accumulate at time of the retirement

salary 65000 per year, jane plans to retire in 25 years. Annual anticipated increaase is 3000 a year. she plans to deposite 5% of her yearly salery, into retirment fund that earns 7% intrest compounded daily.

  Find what is probability of failure with standard deviation

A column has a mean capacity of 950 kip. The standard deviation for the column capacity is 50 kip. The average load is 700 kip with a standard deviation of 75 kip. What is the probability of failure, pf

  Will the surveyor have to measure to locate the new station

Station 3 + 54.67 must be marked in the field. if the steel tape to be used is only 99.98 under standard conditions and if the temperature is 87 degree farenheit at the time of the measurement, how far away from the existing station mark at 0 + 79.23..

  Determine the most economical alternative of return analysis

Using Rate of Return Analysis, determine the most economical alternative below. Assume a minimum attractive rate of return of 6%, and a 5-year life with no salvage value for each. The alternatives are mutually exclusive

  What is one unique fact that be learned about the 950 loader

A local rental yard said that they will supply you the loader for $50.00 per hour plus $4.15 sales tax not including any operating costs. You need to analyze what it would cost your company to purchase the loader instead of renting it.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd