Determine the diameter of commercial steel pipe required

Assignment Help Civil Engineering
Reference no: EM13315534

Determine the diameter of commercial steel pipe required to convey a minimum of 300 cfs of water at 60 deg F with a head loss of 1.2 ft per 1000 ft of pipe. Assume pipes are available in the following nominal diameters (inches): 2, 4, 6, 8, 12, 14, 16, 18, 20, 22, 24, 30, 36, 42, 48, 54, 60, 66, 72

Reference no: EM13315534

Questions Cloud

How many hours elapsed for that activity : A space ship has left Earth and is currently traveling at 80% the speed of light. On board, a crew member takes 6 hours to read a science fiction novel. For an observer on Earth, how many hours elapsed for that activity?
Calculate the mass of the planet from this information : A planet's moon travels in an approximately circular orbit of radius 5.4 107 m with a period of 7 h 21 min. Calculate the mass of the planet from this information
Compare and contrast private with public clouds : Write clearly and concisely about cloud & virtual computing topics using proper writing mechanics and technical style conventions.
What is the maximum speed of the mass : a 5 kg mass is attached to the end of a 1.0-m string. The system is whirled in a horizontal circular path. What is the maximum speed of the mass if the string is not to break
Determine the diameter of commercial steel pipe required : Determine the diameter of commercial steel pipe required to convey a minimum of 300 cfs of water at 60 deg F with a head loss of 1.2 ft per 1000 ft of pipe. Assume pipes are available in the following nominal diameters (inches)
What is the potential difference between the ends of wire : A 1.5 mm-diameter, 40 cm -long copper wire carries a 4.5 A current. What is the potential difference between the ends of the wire
What fraction of the flue gas stream would need to be bypass : The company engineer decides that this is too good, that it is not necessary to be this efficient, and proposed that part of the flue gas be bypassed around the electrostatic precipitator so that the recovery of fly ash (particulates) from the flu..
Find the current of a loop given a straight wire : Using Lorentz Law: You are given a charge moving between two parallel plates. Find the current (I) of a loop given a straight wire
Determine what is the resulting solids concentration : Raw primary sludge at a solids concentraion of 4% is mixed with waste activated sludge at a solids concentration of .5%. The flows are 20 and 24 gal/min respectively. What is the resulting solids concentration

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  Circular and non-circular slip surfaces

The thickness of each layer is determined by the "last" ID number. Four student numbers are used as the example - Circular and non-circular slip surfaces should be considered

  Generate a table of conversions from degrees to radians

Generate a table of conversions from degrees to radians. The first line should contain the value for 0 degrees and last line should contain the value for 360 degrees. allow user to enter the increment to use between the lines in the table

  What are key features of alternative project delivery method

As part of the procurement or contracting department of this federal agency, you need to demonstrate your understanding of the different project delivery methods and contract types available to the agency.

  Determine what should the after burner temperature be

An afterburner has been selected to destroy 99.9% of the ethane (CH3-CH3)in a gas (mostly air) stream . if the residue time is 0.8 seconds and the pressure is 1.1 atmospheres in the after burner,

  What is the design speed of he curve

An equal-tangent crest vertical curve is designed with a PVI at station 110+00 and a PVC at station 107+43.3. if the high point is station 110+75.5 what is the design speed of he curve?

  Determine the velocity as a function of position

A particle travels along a straight line with a constant acceleration. When s=4ft, v=3ft/s and when s=10ft, v=8ft/s. Determine the velocity as a function of position.

  Find the height and the width of the triangular soil bank

The soil's angle of repose is 35° and its swell is 25%. Find the height and the width of the triangular soil bank that will result from the trench excavation

  How to determine the npv and the profitability index

A four year financial project has net cash flows of $20,000; $25,000; $30,000; and $50,000 in the next four years. It will cost $75,000 to implement the project. If required rate of return is 20%, conduct a discounted cashflow calculation

  Construction of the embankment

Pore water pressure is to be observed during the construction of the embankment. Calculate the pore water pressure which must not be exceeded at any point in the clay layer 9 m below the surface of the embankment to ensure a shear strength of 100 ..

  Determine what is the minimum standard size that is needed

a mountain water reservoir in a national park is to provide water at a flow rate of Q= 200 gpm and a minimum pressure of 40 psig in the lodge of the valley 200 ft below the reservoir.

  Compute the maximum service concentrated live load

A 12-ft-long cantilever supports its own dead load plus an additional uniform service (unfactored) dead load of 0.5 kip/ft. The beam is made from normal-weight 4000-psi concrete and has in., in., and in.

  Compute the volume of a waste sludge with water content

Compute the volume of a waste sludge with 96% water content containing 1000 lb of dry solids. If the moisture content is reduced to 92%, what is the sludge volume

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd