Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Determine the diameter of commercial steel pipe required to convey a minimum of 300 cfs of water at 60 deg F with a head loss of 1.2 ft per 1000 ft of pipe. Assume pipes are available in the following nominal diameters (inches): 2, 4, 6, 8, 12, 14, 16, 18, 20, 22, 24, 30, 36, 42, 48, 54, 60, 66, 72
The thickness of each layer is determined by the "last" ID number. Four student numbers are used as the example - Circular and non-circular slip surfaces should be considered
Generate a table of conversions from degrees to radians. The first line should contain the value for 0 degrees and last line should contain the value for 360 degrees. allow user to enter the increment to use between the lines in the table
As part of the procurement or contracting department of this federal agency, you need to demonstrate your understanding of the different project delivery methods and contract types available to the agency.
An afterburner has been selected to destroy 99.9% of the ethane (CH3-CH3)in a gas (mostly air) stream . if the residue time is 0.8 seconds and the pressure is 1.1 atmospheres in the after burner,
An equal-tangent crest vertical curve is designed with a PVI at station 110+00 and a PVC at station 107+43.3. if the high point is station 110+75.5 what is the design speed of he curve?
A particle travels along a straight line with a constant acceleration. When s=4ft, v=3ft/s and when s=10ft, v=8ft/s. Determine the velocity as a function of position.
The soil's angle of repose is 35° and its swell is 25%. Find the height and the width of the triangular soil bank that will result from the trench excavation
A four year financial project has net cash flows of $20,000; $25,000; $30,000; and $50,000 in the next four years. It will cost $75,000 to implement the project. If required rate of return is 20%, conduct a discounted cashflow calculation
Pore water pressure is to be observed during the construction of the embankment. Calculate the pore water pressure which must not be exceeded at any point in the clay layer 9 m below the surface of the embankment to ensure a shear strength of 100 ..
a mountain water reservoir in a national park is to provide water at a flow rate of Q= 200 gpm and a minimum pressure of 40 psig in the lodge of the valley 200 ft below the reservoir.
A 12-ft-long cantilever supports its own dead load plus an additional uniform service (unfactored) dead load of 0.5 kip/ft. The beam is made from normal-weight 4000-psi concrete and has in., in., and in.
Compute the volume of a waste sludge with 96% water content containing 1000 lb of dry solids. If the moisture content is reduced to 92%, what is the sludge volume
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd