Determine the average shear stress in each pin

Assignment Help Civil Engineering
Reference no: EM13542341

1.The pins on the frame at B and C each have a diameter of 0.25 in. If these pins are subjected to double shear, determine the average shear stress in each pin.

2.A point A on the free surface of a free vortex is at a radius rA = 200 mm and a height zA = 125 mm above datum. If the free surface at a distance from the axis of the vortex, which is sufficient for its effect to be negligible, is 180 mm above datum, what will be the height above datum of a point B on the free surface at a radius of 100 mm?

Reference no: EM13542341

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  Draw a queue diagram representing the traffic flow starting

an incident occurs on a freeway that has a capacity in the northbound direction, before the incident, of 4000 veh/h and a constant flow of 2900 veh/h during the morning commute.

  Calculate the shrinkage limit at the minimum volume

At the minimum volume reached during shrinkage, a specimen of soil has a void ratio of 0.87. if Gs = 2.72, calculate the shrinkage limit

  What will be the time- mean speed and space-mean speed

Assume you are an observer standing at a point along a three- lane roadway. All vehicles in lane 1 are traveling at 30 mi/ h, all vehicles in lane 2 are traveling at 45 mi/ h, and all vehicles in lane 3 are traveling at 60 mi/ h.

  Determine the minimum footing length l of the columns

Assume a value of B, compute the allowable bearing capacity, then solve for B. Show at least 1 iteration with whatever assumed width irrespective of whether or not you get the desired Factor of safety.

  Establish a horizontal distance

a tape is calibrated and found to measure 100.04ft between the 0- and 100-ft marks. what measurements should be laid out to establish a horizontal distance of 682.25ft?

  Discuss how would weave risk management into planning

Construction Business Enterprise Risk Management is a very large component in the operation of any contracting venture. Discuss how you, as head of operations, would weave risk management into the planning and operations processes

  Reinforced soil wall major project project reinforced soil

major project project reinforced soil wall design ltbrgtintroduction ltbrgtyour project group is required to design a

  Determine how much money compounded quarterly

A present sum of $50,000 at an interest rate of 12% per year compounded quarterly is equivalant to how much money 8 years ago

  Determine the approximate dimensions of each carbon bed

A two-bed carbon adsorption system is to be designed to handle 8000 acfm of air containing 700 ppm of hexane. Laboratory studies indicate that carbon can adsorb 8lb hexane per 100 lb carbon under the conditions

  Determine what is the acceleration of diatomic oxygen gas

2 kilomoles of diatomic oxygen gas are enclosed in a 10-kg steel container. A force of 2kN now accelerates this system. What is the acceleration

  How high will the stream of water rise above the syringe

A syringe is pointed vertically up in the air and a force of 5 lbs is applied to the plunger with a diameter of 0.5 inches. Assuming no losses in the system how high will the stream of water rise above the syringe

  Find the amount the company must deposit each year

If a company wants to have $100,000 in a contingency fund 10 years from now, the amount the company must deposit each year in years 1 through 5, at an interest rate of 10% per year, is

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd