Determine the approach flow rate and cycle length

Assignment Help Other Engineering
Reference no: EM131142225

In approach to a pretimed signal has 30 seconds of effective red, and D/D/1 queuing holds. The total delay at the approach is 83.33 veh-s/cycle and the saturation flow rate is 1000 veh/h.

If the capacity of the approach equals the number of arrivals per cycle, determine the approach flow rate and cycle length.

Reference no: EM131142225

Questions Cloud

Determine the maximum length of effective red : Assuming that approach capacity exceeds arrivals, determine the maximum length of effective red that will satisfy the local standards.
Did the advertisers accomplish their purpose : Did you buy the product or service because of this commercial? Are there products or services that you refuse to use because of advertisements you have seen?
Draw a high-wage earner''s budget constraint : What happens to her incentives to work? Is it possible that imposing the tax actually will reduce the tax revenues the government receives from the rich?
Which is least likely to be represente in a byzantine mosaic : Which is least likely to be represented in a Byzantine mosaic? Which feature of Hagia Sophia was not part of the original design? The pagan god most often associated with Christ was.
Determine the approach flow rate and cycle length : If the capacity of the approach equals the number of arrivals per cycle, determine the approach flow rate and cycle length.
How communication strategies work in conjunction : Project how marketing to segment of the stay-at-home dads will affect the buying behavior of their children in years to come. Determine two ways to counteract or foster the positive or negative influences for products that you believe may be affec..
Draw the activity on node project network : Draw the Activity On Node project network.- Identify the critical path clearly and determine the total project time.
Determine the arrival rate : Determine the arrival rate assuming that it is unchanged over the duration of the observation period (from the beginning to the end of this 5.78-vehicle-minute delay cycle).
Determine the complete queue clearance : The saturation flow rate of the approach is 1800 veh/h, the cycle length is 60 seconds, and the effective green time is 40 seconds. Determine the total vehicle delay until complete queue clearance.

Reviews

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd