An equal tangent vertical curve is to be constructed between grades of -2.0% (initial) and 1.0% (final) .The PVI is at station 3+352.8 and the elevation 128.016m. Due to a street crossing a roadway, the elevation of the roadway at station 3 +413.760 must be at 129.388 m. Design the curve?

Reference no: EM1383095

Questions Cloud

Describe the coverage strategy you would employ : Assume you are the manufacturer of a new type of electronics products which will sell for over $300 at retail. Describe the coverage strategy you would employ and provide your rationale.
What is the net force on each side of the box : A container of hot water at 80 degrees cools to 79 degrees in 15 seconds while it is placed in a room that is t 20 degrees. Use newton's law of cooling to estimate the time it will take for the container to cool from 50 degrees to 49 degrees.
Which of the following is a term for a state statute : Which of the following is a term for a state statute authorizing boards of corporations to take into account all stakeholders and constituencies
Elucidate how would the information a management accountant : Elucidate how would the information a management accountant would use to determine company costs change depending on type of production.
Designing the tangent vertical curve : Due to a street crossing a roadway, the elevation of the roadway at station 3 +413.760 must be at 129.388 m. Design the curve?
Wb wanted to purchase our company for 20% more : WB wanted to purchase our company for 20% more than our estimated value. they would also employe me. what would you do? explain?
How to access to elements of document object model : To limit creation of malicious code, do you believe that access to elements of document object model and some Javascript functionality be limited?
Products which offers for sale-wheat cereal : Vega Foods, Inc., has recently purchased a small mill which it intends to operate as one of its subsidiaries. The newly acquired mill has three products which it offers for sale-wheat cereal, pancake mix, and flour.
What is the increase in temperature of the bullet : A 2 g lead (cp = 128 J/kg•°C) bullet travelling at 325m/s is stopped by the large tree. If half the kinetic energy of the bullet is transformed into internal energy and remains with the bullet whereas the other half is transmitted to the tree, wha..

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  Construction of the embankment

Pore water pressure is to be observed during the construction of the embankment. Calculate the pore water pressure which must not be exceeded at any point in the clay layer 9 m below the surface of the embankment to ensure a shear strength of 100 ..

  Radioactive waste from a clinical laboratory

A radioactive waste from a clinical laboratory contains 0.2 μCi (microcuries) of calcium-45 (45Ca) per liter. The half-life of 45Ca is 152 days.

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Ratio of the magnitude in uniform electric field

What is the ratio of the magnitude of E2 to the magnitude of E1? You may neglect the effects of gravity on the proton.

  Construction loan and mortgage loan

Differentiate between construction loan and mortgage loan based on your understanding (using your own words). Define the following terms in your own words: (a) cap rate, (b) economic value of a project, and (c) gap financing.

  Volume of the lake

Suppose that the distance from the lake outlet to the withdrawal cannot be more than 20 mi. What should be the new volume of the lake?

  Dry unit weight of material

A soil borrow material in its natural state in the ground has a unit weight of 118pcf. Its natural water content is 7%. What is the dry unit weight of this material?

  Highest point of the piping system

a) The maximum flow rate that can be achieved without cavitation occurring in the piping system. b) The maximum elevation of the highest point of the piping system to avoid cavitation.

  Calculate net present value

Set up life cycle diagram for both alternatives and calculate net present value (NPT) and annual cost for the life time.

  Practice autocad software package

To provide knowledge and practice AutoCAD software package for engineering activities.

  Rankine cycle and thermal efficiency

Determine the rate at which heat is added in the boiler, the power required to operate the pumps, the net power produced by the cycle, and the thermal efficiency.

  Introduction to consolidation settlements

Include immediate and consolidation settlements, but ignore secondary compression. In your calculation, use three sublayers with thicknesses of 4 ft, 8 ft and 16 ft for the top, middle and bottom layers. Ignore any settlement caused by the dense s..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd