Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Assume the ledge has the dimensions shown and is attached to the building with a series of equally spaved pins around the circumference of the building. Design the pins so that the ledge can support Doug and Jeremy and eight others on each side of the building. Assume each person weighs 200 lbs.
Pin properties: Ultimate shear strength = 100 lb/in^2
Ledge properties: Ultimate shear strength = 200 lb/in^2
Ultimate bearing strength = 300 lb/in^2
Density = 300 lb/ft^3
You must design the pin spacing along the ledge, pin length (in the ledge), pin diameter, and the pin spacing from the top of the ledge. "
Terry wants to purchase a used car for $8000. The dealer offered to finance the deal at 8.5% APR for 4 years with 10% down payment. Terry's bank will provide a loan at 7.8% for 3 years, but wants a 20% downpayment.
A Fe-.25 w/o Carbon alloy is sloly cooled to 700 degrees C. What is the composition of the Ferrite(alfa) phase and what is the compositon of the cementite(Fe3C) phase. Whate are the relative fractions of ferrite and cementite
A human with a surface area of 2 m^2 and a surface temperature of 27 degrees celcius radiates into a large room (which acts as a black body), the surfaces of which are at 15 degrees celcius.
Compute the volume of a waste sludge with 96% water content containing 1000 lb of dry solids. If the moisture content is reduced to 92%, what is the sludge volume
Exhaust gas from a chemical process flows at a rate of 8,000 actual cubic feet per minute (acfm) from point A at 250°F and 1 atm pressure. It flows through a circular duct to a fan
A sailor is being rescued using a boatswain's chair that issuspended from a pulley that can roll freely on the support cableACB amd is pulled at a constant speed by cablle CD
A completely reversible heat engine uses a solar receiver for a hightemperature reservoir and a lake for a low temperature reservoir. The sun maintains the receiver surface at 290 ° F while the lake remains at 40 °F.
Draw a diagram of the room with all of the important parameters noted with symboles. Write a material balance to describe the rate of change in the amount of benzene in the air of the room starting from the time the bottle was opened onwards.
Determine the maximum temperature in the tank. Take the thermal conductivity of the wastes as 2.0 W/mK.
The shovel's production at a 100% efficiency is estimated to be 300 BCY/h. and efficiency is 0.80. Truck travel time is estimated to be 8.0 minutes, and truck fixed cycle time (excluding loading ) is estimated to be 2 minutes.
How many hours should it take an articulated wheel loader equipped with a 4 yd bucket to load 3000 cu yd of gravel from a stockpike into rail cars
How long would it take to fill a 30 yd^3 packer truck that compresses waste to 750 lb/yd^3 if it travels 100 ft between stops at an average of 5mph and it takes 1 minute to load 200 lb of waste at each stop
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd