Describe the additional factors that impact global supply

Assignment Help Operation Management
Reference no: EM13230755

Based on the concept of globalization, many businesses operate and compete in a global environment. Describe the additional factors that affect/impact global supply chains.

Reference no: EM13230755

Questions Cloud

Determine the excitation voltage ef and the power angle : A 3-phase, 20 kVA, 208 V, 4-pole star-connected synchronous generator has a synchronous reactance of Xs = 1.5 ohm per phase. The resistance of the stator winding is negligible. The machine is connected to a 3-phase 208 V infinite bus.
Write specifications a method that advances any given date : A date consists of a month, day, and year. Frequently, we represent each of these items as integers. For example, July 4, 1990, is a month 7, day 4, and year 1990.
Design a circuit using only one omp-amp : Design Problem- the circuit must have the following transfer function: Tv(s)=+- (s+125)(s+500)/(s+250)(s+1000) a)design the circuit using two Omp-amps B) design a circuit using only one omp-amp c) design a circuit using no omp amp *in all designs ..
Compute the rms speed of ph3 atoms or molecules : Calculate the rms (average) speed of PH3 atoms or molecules at 123 oC. Use R = 8.314 kg-m2/K-s2-mol for the value of the gas constant. The average speed of a PH3 atom/molecule at 123 oC is 539 m/s.
Describe the additional factors that impact global supply : Based on the concept of globalization, many businesses operate and compete in a global environment. Describe the additional factors that affect/impact global supply chains.
Explain the genetic variation : How would the research programs of the two schools have influenced their perceptions about the amount of genetic variation present in the wild?
Estimate the electron and hole drift velocity : Consider an n-Si with doping of 9*10^16cm^-3. In a certain region of this sample, there is an electric field of 1000V/cm. Estimate the electron and hole drift velocity and the total drift current density in that region.
What is the maximum possible output per week for this line : An assembly line with 7 tasks is to be balanced. The longest task is 8 minutes, the shortest task is 2 minutes, and the sum of the task times is 53 minutes. The line will operate for 6 hours per shift, 1 shifts per day, 6 days per week.
The project duration and identifies the critical path : Calculates the project duration, and identifies the critical path. While preparing the project plan, categorise the project tasks in the different phases of initiating, requirements gathering, design, development and testing, documentation, and de..

Reviews

Write a Review

Operation Management Questions & Answers

  How many units should r c

The holding cost is 10 percent of the purchase cost. How many units should R. C. order to minimize his total annual inventory cost?

  Explain the differences between a regionalized model of care

Explain the differences between a regionalized model of care and the dispersed model of care. I

  What is the variance estimate of this activity

One of the activities on the critical path has an optimistic time of 5 minutes, a most likely time of 6, and a pessimistic time of 17. What is the variance estimate of this activity?

  Determine a linear trend line for expected freight car

Determine a linear trend line for expected freight car loadings. (Round your intermediate calculations and final answers to 3 decimal places.)

  Is it more cost-effective for groundz to switch suppliers

Groundz can place orders only once a month. Inventory and ordering costs would remain the same. Is it more cost-effective for Groundz to switch suppliers? Should Groundz switch? (new total cost $3042.67, switch)

  Can gilbert recover from professor keller for copyright

Can Gilbert recover from Professor Keller for copyright infringement for photocopying 3 pages of Gilbert's treatise also distributing it to class for studying?

  Use universal studios and six flags for competitors in cpm

Can you prepare EFE and CPM matrixes for Disney's Parks and Resorts division. Use Universal Studios and Six Flags for competitors in the CPM.

  Prepare the optimal solution

Write the Optimal Solution and the Optimal Solutions should include the optimal values for the non-zero variables as well as the objective function.

  Name at least two other worker protection laws

Name at least two other worker protection laws. What is unemployment compensation? What is social Security? What is the National Labor Relations Board and what does it regulate?

  What are some of the challenges expected to operate

What are some of the challenges expected to operate a multinational corporation in the U.A.E?

  Formulate the problem as a linear programming model

Formulate the problem as a linear programming model (i.e. define the variables, and write down the objective function and all constraints in algebraic form).

  What is supply chain management

What is supply chain management? How does supply chain management differ from value chain management? How does value chain management satisfy customer requirements?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd