Reference no: EM132220831
1. Describe Standard Data Systems. Include in your answer the task hierarchy level
2. Describe a work scenario where you think Standard Data Systems would be the preferred method of work measurement.
3. What are the general characteristics and requirements of work situations for which a standard data system is most suited?
4. Describe the steps suggested by Groover (2007) when using a Standard Data.
5. Similarly, read through the list of disadvantages in developing and using a Standard Data System in section 15.5 of Groover’s (2007) textbook. Briefly describe two of the disadvantages you feel are the reasons not to develop and utilize a Standard Data System, and why. (1 point) Answer:
6. Describe Work Sampling. Include in your answer the task hierarchy level
7. Describe a work scenario where you think Work Sampling would be the preferred method of work measurement
8. What are the general characteristics of work situations for which work sampling is most suited?
9. Briefly describe the three implementation issues with work sampling.