Your next project site is an old landfill, which reaches a depth of 30 feet. Below, there are many layers of both competent and caving soils, but none of the competent soil layers capable of giving the needed bearing capacity under the 12'' diameter and 60 feet deep drilled shafts that you are to use. It is known that the layer at 60 feet provides about 20% of the bearing capacity needed, and all the competent soil layers up to this depth provide an accumulated 50% of the necessary friction.

Understanding that according to design specifications the drilled shaft diameter needs to be kept at 12" diameter and up two consecutive pre-fabricated piles can be used (120 feet). Assuming that the soil layers continue much beyond 60 feet in a similar pattern (obviously no landfill) in terms of friction and bearing capacities, recommend two different solutions that could allow the shafts to transmit their loads by 1) end bearing capacity and by 2) friction. If an underream at 60 feet was to be used, which needs to be its minimum diameter?

Reference no: EM13326209

Questions Cloud

How far up the incline will the skier move : How far up the incline will the skier move if the coefficient of kinetic friction between the skies and snow is 0.101
Kants solution to the free-will problem relies : Kant's solution to the free-will problem relies on
Article in lawn news-advising landscaping businesses : Tom inherited his father’s landscaping business, and incorporated the business after he read an article in Lawn News, advising landscaping businesses to incorporate. Tom has been sued by a customer, whose prize rose bushes were accidentally damaged b..
Explain is the energy of the system increased : When a bow and arrow are cocked, a force is applied to the string to pull it back. Is the energy of the system increased? Explain
Define which needs to be shafts minimum diameter : Assuming that the soil layers continue much beyond 60 feet in a similar pattern (obviously no landfill) in terms of friction and bearing capacities, recommend two different solutions that could allow the shafts to transmit their loads by 1) end be..
What is the increase in kinetic energy of the mass : A net force of 20 N accelerates a 9-kg mass over a distance of 20 m. What is the increase in kinetic energy of the mass
What are your values-what are your beliefs : What are your values? What are your beliefs? What do you think about? What do you dream about? What do you cry about? What do you sing about? What are your strengths?
What is its speed at the top of the second hill : On a roller coaster the first hill has a height of 30m while the second hill as a height of 15m. what is its speed at the top of the second hill
Which of the techniques discussed in class would appropriate : You want to make sure that the hill slope -the earth of which has also been excavated by your teams and the organic soil and vegetation removed- will remain stable for the safety of your workers.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine horizontal distance ab and elevation of point a

The height of the instrument during this measurement was 1.60m From the same setup from point A, the zenith angle and slope distance toward point B are measured as 83deg 32'30" and 186.23m respectively, while the elevation of point B is 315.34m AM..

  What is the water content of the material when saturated

The dry density of a compacted sand is 1.87 Mg/m^3 and the density of the solids is 2.67 Mg/m^3. What is the water content of the material when saturated. Include a phase diagram.

  What is the maximum horsepower that the system can produce

A ssume that one half of the energy incident on the collector goes to this reservoir, which, in turn, serves as a source for a heat engine. If the temperature of the atmosphere is 70 F,

  Determine the volume flow rate

Water with a static pressure of 1.96kN/M2 flows through an 800 mm diameter pipe. A pitot tube pressure gage in this pipe reads a pressure of 5.88 kN/M2. How do you determine the volume flow rate (Q) of the water? (Q = 1.40 M^3/sec, V=2.79 M/sec)

  How long must diameter be for mallet to balance at a point 6

A wood mallet has a cylindrical head 6 inches long and 3 inches in diameter. If the cylindrical head is 1 inch in diameter how long must it be for the mallet to balance at a point 6 inches from where the handle enters the mallet

  Determine what is the discharge of each hole

a water of 20 c temprature pupped at 75 kpa to a perforated pipe 5 cm dia. contain 10 hole with the same diameter. the distance between two adjacent hole is 20 cm. what is the discharge of each hole

  What would be the the depth of water im millimeters on land

a tank contains 650 cubic feet of water.the water will be applied on 7 acres of land. What would be the the depth of water im millimeters on the land assuming that there are no losses

  Find what is the present worth of the three payments

payments of $1000 are to be made at the end of each year for the next 3 years. What is the present worth of the three payments if interest is 12% compounded monthly

  Estimate what is the total volume of runoff

It rains 3.0 in. on a 20.0 acre watershed. What is the volume of rainfall excess if 30% of the watershed area is a lake and infiltration on the soil is estimated at 1.0 in. What is the total volume of runoff

  What rate of superelevation is required for the curve

A new interstate highway is being built with a design speed of 70 mi/h. For one of the horizontal curves, the radius (measured to the innermost cehicle path) is tentatively planned as 2500 ft. What rate of superelevation is required for this curve

  Calculate the stopping sight distance over the crest

Calculate the stopping sight distance over the crest of a 1,500 ft vertical curve with a plus grade of 4.4percent and a minus grade of 2.3 percent.

  Will the vc meet minimum ssd standards if speeds limited

A particular crest vertical curve (VC) on US 280 at Shelton Mill Rd has long been criticized as being unsafe. Its length is 400 feet. The prevailing speed on the crest VC is 50 mph. In its present condition, its tangent grades are G1=2 percent and..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd