Define stripping ratio and give three examples

Assignment Help Other Engineering
Reference no: EM13753807

11.Answer the following:

a. Define stripping ratio and give three examples of the units it may be expressed in.

b. Define maximum stripping ratio.

c. Draw a section through an open pit showing the following:

i. Pit slope

ii. Bench slope

 iii. Bench crest

 iv. Pit floor

v. Bench toe

vi. Bench width

 

12.Draw a plan and cross-section of a dragline casting overburden from a new strip to an old strip in a coal mining stripping situation for a single seam and for a two seam operation.

13.Draw sketches to explain:

a. Declining stripping ratio

 b. Increasing stripping ratio

 c. Constant stripping ratio

14.The total cost of ore mining at an open pit is $ 2.60 per tonne and that for waste is $ 1.90 per tonne. If the value of the ore is $ 14.90 per tonne and the company requires a 20% profit margin, what is the maximum stripping ratio?

15.What are the advantages and disadvantages of wheeled loaders? 16.What are the advantages of trolley assist for a truck haulage system?

17.What are the advantages and disadvantages of open pit mining?

18.What are the advantages and disadvantages of open cast mining?

19.Answer the following:

i.  In general, a road consists of several layers. Draw and label different layers and discuss their functionality.

ii.      How is the load from the tyres distributed in the different layers of a road foundation? Discuss.

iii.     Draw a typical stress envelope for dual rear wheel tyres for a truck.

iv.     Point out, on the drawing, the most affected area on the sub-grade.

20.Dragline Output

i.          A dragline with a 1½ cu yd bucket working in wet, sticky clay, with a swell factor of 20%, handles an average loose volume of 1.8 cu yd. It can complete 3 cycles per 2 minutes. Calculate ideal output, based on digging at optimum depth with a 90°angle of swing, and no delays.

ii.   Using the tables provided, calculate the probable output if the angle

of swing is actually 120°and the depth of cut is 10ft.

 

Table 5.2: Ideal Output of Short-boom Draglines in Cubic Yards per Hour Bank Measure

Class of material

 

Size of bucket (cu yd)

 

3/8

 

1/2

 

3/4

 

1

 

 

 

 

2

 

 

Moist loam or light sandy clay

 

5.0

 

5.5

 

6.0

 

6.6

 

7.0

 

7.4

 

7.7

 

8.0

 

8.5

 

 

70

 

95

 

130

 

160

 

195

 

220

 

245

 

265

 

305

 

Sand and gravel

 

5.0

 

5.5

 

6.0

 

6.6

 

7.0

 

7.4

 

7.7

 

8.0

 

8.5

 

 

65

 

90

 

125

 

155

 

185

 

210

 

235

 

255

 

295

 

Good common earth

 

6.0

 

6.7

 

7.4

 

8.0

 

8.5

 

9.0

 

9.5

 

9.9

 

10.5

 

 

 

 

55

 

75

 

105

 

135

 

165

 

190

 

210

 

230

 

265

 

Hard ,tough clay

 

7.3

 

8.0

 

8.7

 

9.3

 

10.0

 

10.7

 

11.3

 

11.8

 

12.3

 

 

35

 

55

 

90

 

110

 

135

 

160

 

150

 

195

 

230

 

Wet, sticky clay

 

7.3

 

8.0

 

8.7

 

9.3

 

10.0

 

10.7

 

11.3

 

11.8

 

12.3

 

 

20

 

30

 

55

 

75

 

95

 

110

 

130

 

145

 

175

 

 

 

Table 5.3:The Effect of the Depth of Cut and Angle of Swing on the Output of Draglines

Per cent of optimum depth

 

Angle of swing (deg.)

 

30

 

45

 

60

 

75

 

90

 

120

 

150

 

180

 

20

 

1.06

 

0.99

 

0.94

 

0.90

 

0.87

 

0.81

 

0.75

 

0.70

 

40

 

1.17

 

1.08

 

1.02

 

0.97

 

0.93

 

0.85

 

0.78

 

0.72

 

60

 

1.24

 

1.13

 

1.06

 

1.01

 

0.97

 

0.88

 

0.80

 

0.74

 

80

 

1.29

 

1.17

 

1.09

 

1.04

 

0.99

 

0.90

 

0.82

 

0.76

 

100

 

1.32

 

1.19

 

1.11

 

1.05

 

1.00

 

0.91

 

0.83

 

0.77

 

120

 

1.29

 

1.17

 

1.09

 

1.03

 

0.985

 

0.90

 

0.82

 

0.76

 

140

 

1.25

 

1.14

 

1.06

 

1.00

 

0.96

 

0.88

 

0.81

 

0.75

 

160

 

1.20

 

1.10

 

1.02

 

0.97

 

0.93

 

0.85

 

0.79

 

0.73

 

180

 

1.15

 

1.05

 

0.98

 

0.94

 

0.90

 

0.82

 

0.76

 

0.71

 

200

 

1.10

 

1.00

 

0.94

 

0.90

 

0.87

 

0.79

 

0.73

 

0.69

 

 

Reference no: EM13753807

Questions Cloud

How were marketing and non-marketing personnel briefed : How were marketing and non-marketing personnel briefed and Summaries stakeholder briefings regard ng their implementation roles
Operations and information management : Operations and Information Management Assignment: You are asked to provide a critical discussion on the implementation of lean which addresses the following questions: Is there a best way to implement lean? Are all organisations suitable for lean imp..
Determine the corrected production for the dozer : Determine the corrected production for the dozer for downhill dozing on a 5% slope, with a 50 minute working hour and an average operator as per the correction factors below.
Determine the loosening costs in the following situation : Determine the loosening costs in the following situation: Machine D11R Tractor with No. 11 single shank ripper in coal Rip spacing 1600mm
Define stripping ratio and give three examples : Define stripping ratio and give three examples of the units it may be expressed in.
Operations that are associated with surface mining : List all the major mining operations that are associated with surface mining.
Draw a plan of a typical strip mine : Draw a plan of a typical strip mine showing all operational features and equipment.
Why were oracles sought and recorded in ancient greek world : Why were oracles sought and recorded in the ancient greek world?
Why did the united stated acquire louisiana : Why did the United Stated acquire Louisiana?

Reviews

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Environmental engineeringquestion 4 the wastewater from a

environmental engineeringquestion 4 the wastewater from a restaurant contains organic matter with a theoretical oxygen

  Problem on a network by drawing nodes

Express the above problem on a network by drawing nodes, arcs, determining node values, arc costs, arc capacities if any, such that no node has a capacity restriction associated with it and no node has a cost for using the node

  Solve the two question below using excel spreadsheet1 a

solve the two question below using excel spreadsheet.1. a small machine costs 10000 and at the end of a 5 year life

  Environmentalnbspengineeringquestion 1 the concentration of

environmentalnbspengineeringquestion 1 the concentration of silver in seawater is 50 parts per trillion and the total

  Calculate the volumetric flow rate

Calculate the volumetric flow rate and the mass flow rate and determine the average flow velocity of the air and the air quantity flowing

  What is the potential risk of euc hazards

What are Fire and Gas (F & G) detection and mitigation systems - why are F and G systems necessary

  Formulate a mixed-integer-linear-programming model

Formulate a mixed-integer-linear-programming model for the problem above by defining the decision variables, expressing objective function and constraints as functions

  What is meant by point-of-operation guards

What is meant by point-of-operation guards and What are the three types of point of operation guards? What are their advantages and limitations and Briefly describe four requirements that all safeguards should have.

  How much oxygen is required to satisfy the bod demand

Calculate the surface area and depth of an "ideal" settling tank to remove all 10um spherical particles (SG = 2.65) from 1000 m3 of wastewater per day and provide a detention time.

  Write procedures to manipulate queues

Write a procedure (make-queue) that produces independent first-in-first-out queue objects, using a message-passing style.

  What measurements can possibly be made

What measurements can possibly be made in order to determine if corrosion is taking place and what is a salt bridge? What purpose does it serve? With respect to ORP analyzer

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd