Create a gantt chart or project plan

Assignment Help Basic Computer Science
Reference no: EM13550056

You have been made the Chief Information Officer and Chief Technology Officer (CIO / CTO) of an innovative e-Commerce start-up company that a venture capital group has funded. The CEO has given you sixty (60) days to deliver an information technology project plan in anticipation of the company locating to a new facility. Since this is a start-up company, there is currently no building or technology infrastructure to support the business. All information technology (hardware and software) must be implemented in either a hosted solution, on-site solution or a hybrid model. The CEO is expecting you to integrate different technologies from different partners and incorporate industry best practices in connection with the development of technological systems. The new facility is a two-story stand-alone building. The company currently consists of ten (10) employees with revenues of $5 million but is expected to grow to thirty (30) employees with revenue of $30 million over the next two (2) years.

Section 1: Project Introduction

1. Write a two to four (2-4) page project introduction that includes the following:

a. Background information of the company.

b. The type of business in which the company is involved.

c. A description of the information systems that the company should have to support the business. The description should include the following:

i. databases
ii. systems analysis
iii. security
iv. networking
v. computer infrastructure
vi. human computer interaction
vii. Web design

d. The use of at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Section 2: Gantt Chart / Project Plan

Use Microsoft Project or an open source alternative, such as Open Project, to:

2. Create a Gantt chart or project plan (summary and detailed) template. The Gantt chart or project plan should:

a. Record all tasks, subtasks, resources, and time related to the project.

b. Outline the planning, analysis, design, and implementation phases.

c. Develop in accordance with the systems development life cycle (SDLC).

Verified Expert

Reference no: EM13550056

Questions Cloud

Length of chain passes over top of sprocket during interval : An 16--long bicycle crank arm, with a pedal at one end, is attached to a 23--diameter sprocket, the toothed disk around which the chain moves. A cyclist riding this bike increases her pedaling rate from 65 to 95 in 12 . What length of chain passes ov..
How much does the air pressure drop in the constriction : Breathing deep, your professor inhales air at 0.203 m/s. As the air goes through a constriction in his bronchus, it doubles in speed. How much does the air pressure drop in the constriction
What is the oscillators maximum speed : A 368g oscillator has a speed of 98.5cm/s when its displacement is 2.70cm and 72.0cm/s when its displacement is 5.00cm. What is the oscillator's maximum speed?
Compute what is the final temperature of the mixture : A 65-g ice cube at 0°C is placed in 887 g of water at 25°C. What is the final temperature of the mixture
Create a gantt chart or project plan : Develop in accordance with the systems development life cycle and Create a Gantt chart or project plan (summary and detailed) template.
Evaluate the induced emf in the inductor : A 2.2 A current is flowing in a 18 H inductor. A switch is opened, interrupting the current in 2.0 ms. Find the induced emf in the inductor
What is the pipes diameter at the refinery : A round pipe of varying diameter carries petroleum from a wellhead to a refinery. At the wellhead the pipe\'s diameter is 58.3 cm and the flow speed of the petroleum is 11.1 m/s. At the refinery the petroleum flows at 5.35 m/s. What is the volume flo..
Determine how much energy will the resistor dissipate : You're a safety engineer reviewing plans for a university's new high-rise dorm. The elevator motors draw 20 A and behave electrically like 2.6-H inductors. How much energy will the resistor dissipate
Estimate the horizontal distance the arrow will travel : An arrow is shot at an angle such that it's horizontal velocity is 40 m/s and it's vertical velocity is 20 m/s. Find the horizontal distance the arrow will travel before hitting the ground

Reviews

Write a Review

Basic Computer Science Questions & Answers

  Design the logic for a program

Modify the program so that if a participant has more than one record, you output the name only once, but you also output a count of the total number of classes the participant has taken.

  Create a program that will calculate the daily pay

Using a loop, create a program that will calculate the daily pay and total pay assuming you get paid 1 penny the first day and then double every day after the first day. Display these numbers in a listbox. Use a inputbox to ask the user how many d..

  How itdepartment helps organization achieve strategic goels

Discuss how the IT department helps the organization achieve their strategic goals

  Security by implementing database auditing

You are a DBA for corporation's databases. The management has decided to increase security by applying database auditing yet they are unspecific what actions to audit.

  Replace the level one heading with the words for your

triple click your mouse anywhere in this paragraph to replace this text with your introduction. often the most

  Why linux is installed on only a very small fraction of desk

1) Describe some reasons why Linux is installed on only a very small fraction of desktop computers. Are there particular categories of products or users who might see Linux as more appealing than conventional operating systems? Do you think Li..

  Input devices

Compare how the gestures data is generated and represented for interpretation in each of the following input devices. In your comparison, consider the data formats (radio waves, electrical signal, sound, etc.), device drivers, operating systems suppo..

  Required value for the move command

Shape_index is a required value for the move command. It is the index of the shape in the shape data arrays that you wish to move. It should range between 0 and MAX_SHAPES - 1. Be sure to validate the index.

  Identify the system high and system low

Draw a lattice of a 2-element set ordered by inclusion.

  What kind of a binary tree is the heap

What kind of a binary tree is the heap? Explain different operations of heaps. Compare heaps to binary search trees in term of efficiencies of main operations.

  Benefits of a web-based computing environment

Web-based computing so for this essay question, explain in scholarly detail benefits of a Web-based computing environment.

  How success or failure of restoration effort is estimated

Expalin why and how is success or failure of restoration effort estimated? Write down some significant considerations in creating monitoring plan to estimate restoration effort?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd