The average slope distance of 500m was measured with utilizing infrared light with wavelength = .91 um has a modulating frequency at 24.5 MHz. At the time of the measurement, the temperature was 27 degrees C and the atmospheric pressure was 755.1 mmHg. Compute the modulated wavelength under the given atmospheric conditions and of 50% humidity.
A concentrated downward force of 2000 lb. is located 6' from the left support, and a uniformly distributed load of 200 lbs./lin. ft. begins 6' to the right end of the member. What force must be applied at each connection to maintain equilibrium?
for this purpose replace this force by its equivalent of two forces at At Ft parallel and Fn perpendicular to the beam. Determine Ft and Fn.
Need to design a cantilever retaining wall 8m high, saturated unit weight is 16kn/m 3 , surcharge is 7kn/m 2 , load above wall supported on wall stem
A concrete box girder bridge has the rectangular x-section. The box is prismatic and considered thin-walled. It span is L=48m and simply supported at points A,B,C and D. The supports are assume to be able to transfer tensile forces.
Determine the magnitude of reaction at point A (in kips) of a 20' beam with 5kips at 4' of the beam and 2kips at 9' of the beam at 350lbs./ft.
what is the difference between factor of safety in rankine & coulomb in overturning, sliding and bearing capasity ?
assuming that the velocity variation within the main channel and the floodplain subsections is much smaller than the change in mean velocities between subsections, find the value of the kinetic energy correction coefficient.
A traffic engineer is trying to design a left turn bay on an EB approach to an intersection. The signal timing for left turns will have 10 seconds of "left turn only" green time and 50 seconds of red time each signal cycle.
a) Determine the total shortening of the pile in terms of F, L, A, and E; b) If F=96 kips, L=40 ft., A=100in2, and E=1.5 x 106 psi, how much does such a pile shorten?
The casting has a mass of 3Mg. Suspended in a vertical position and initially at rest, it ia given an upward speed of 200mm/s in o.s^s using a crane hook H. Determine the tension in cables AC and AB during this time interval if acceleration is con..
A freeway has a capacity of 4500 veh/hr. A traffic accident occurs at 9AM and the freeway is closed. At 9:15 AM, the freeway is partially opened with capacity of 1500 veh/hr. Freeway is restored to full capacity 4500 veh/hr at 9:30 am.
Name three types of metamorphic foliations, and draw a small sketch that shows a situation. Where a metamorphic foliation could cause problems in an excavation.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!