Question - ABC Corporation is producing 55 metal barrels to store oil. The main materials used are steel and plastic. The budgeted information for direct materials and direct manufacturing labor for April 2019 were as follows:

Barrels produced 5,200

Direct materials per sq.m.

Steel $3

Plastic $1.5

Direct material per unit

Steel (sq.m.) 20

Plastic (sq.m.) 7

Direct labour hours per unit 2.3

Direct labour cot per hour $12

The actual number of barrels produced was 4,920. The actual cost of steel and plastic was $283,023 (95,940 sq. ft.) and $50,184 (33,456 sq. ft.), respectively. The actual direct labor cost incurred was $118,572 (9,840 hours). There were no beginning or ending inventories of materials.

Required - Compute the following variances. Comment on the variances, with particular attention to the variances that may be related to each other and the controllability of each variance:

1. Selling-price variance.

2. Direct materials price variance.

3. Direct materials efficiency variance.

4. Direct manufacturing labor efficiency variance.

Reference no: EM132538825

Questions Cloud

Price of the car if the interest rate on the loan : What was the price of the car if the interest rate on the loan is j12 = 9%?
Calculate Andrew return on investment : Assuming production and sales decrease by 5%, calculate Andrew's return on investment. Is increasing the selling price a good idea
Calculate the bond value-pyramids company : Suppose outstanding bond of Pyramids company pays 7% annually coupon interest rate, with $ 1000 face value, and remaining years to maturity is 12 years.
Determine the bonds yield to maturity : XYZ corporation's bonds currently sells for $ 1200, have an 8% coupon interest rate and a $1000 par value, pay interest annually
Compute the direct manufacturing labor efficiency variance : The actual number of barrels produced was 4,920. The actual cost of steel and plastic was $283,023. Compute the direct manufacturing labor efficiency variance
Impacts of disruptions : THE IMPACTS OF DISRUPTIONS ON THE SURGICAL TEAM'S ROLES AND RESPONSIBILITIES DURING SURGICAL PROCEDURE IN THE OPERATING ROOM
What is the future value of thee cash flows : BCTronics has identified an investment project with the following cash flows.
Journalise the transactions for manex ltd. : Journalise the transactions for Manex Ltd. Include an explanation for each entry. Payment of half yearly interest on 1 January 2017.
What is the maximum business interest deduction : George operates a business that generated revenues of $68 million and allocable taxable income of $1.43 million. What is the maximum business interest deduction

Reviews

Write a Review

Accounting Basics Questions & Answers

  How much control does fed have over this longer real rate

Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest.   How much control does the Fed have over this longer real rate?

  Coures:- fundamental accounting principles

Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.

  Accounting problems

Accounting problems,  Draw a detailed timeline incorporating the dividends, calculate    the exact Payback Period  b)   the discounted Payback Period. the IRR,  the NPV, the Profitability Index.

  Write a report on internal controls

Write a report on Internal Controls

  Prepare the bank reconciliation for company

Prepare the bank reconciliation for company.

  Cost-benefit analysis

Create a cost-benefit analysis to evaluate the project

  Theory of interest

Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR

  Liquidity and profitability

Distinguish between liquidity and profitability.

  What is the expected risk premium on the portfolio

Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.

  Simple interest and compound interest

Simple Interest, Compound interest, discount rate, force of interest, AV, PV

  Capm and venture capital

CAPM and Venture Capital

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd