A simple highway curve is planned to connect two horizontal tangents that intersect at sta. 2500+00.00 at an external angle of 52°.  For a design speed of 60 mi/h and a curve radius of about 1.25 times the minimum allowable, calculate (a) the design rate of superelevation and (b) the required length of superelevation runoff.  Assume a four lane undivided highway and 10-ft lanes.  Clearly state any other assumptions that you think are needed.

Reference no: EM13562472

Questions Cloud

Evaluate what wavelength of light is being used : A 3690-line/cm grating produces a third-order fringe at 21.4deg angle. What wavelength of light is being used
Determine the alkalinity and ph of the mixture : Two waters are in equilibrium with air, one at pH 9.5 and one at pH 7.3. these waters are mixed in 1:1 proportions. Assuming that carbonate species dominate the acid/base behavior of boh solutions and that no gas transfer occurs when they are mixed
What is the orbital velocity of particles : If you observe light reflected from Saturn's rings, youshould see a redshift at one edge of the rings and a blueshift atthe other edge. what is the orbital velocity of particles at the outer edge of the rings
Find what is the velocity of cars after they stick together : an car mass 1000kg is traveling east30m/s . it is hit by another car 2000kg whick was travelingnorthwest at 20m/s.the two cars stick together. what is the velocity of the cars after they stick together
Calculate the design rate of super elevation : A simple highway curve is planned to connect two horizontal tangents that intersect at sta. 2500+00.00 at an external angle of 52°.  For a design speed of 60 mi/h and a curve radius of about 1.25 times the minimum allowable
What is the probability in each year that a flood : The annual maximum series of flood magnitude in a river has a normal distribution with a mean of 6000 m^3/s and a standard deviation of 800 m^3/s
Determine the total delay maximum queue length and the time : Vehicles arrive at a tollbooth according to the function h(t)= 5.2-0.2t, where h(t)is in vehicles per minute and t is in minutes. The toll booth operator processes 3 vehicles per minute. Determine the total delay, maximum queue length, and the time i..
Calculate the circulating load of cleaner tailings : A froth flotation process is used to concentrate copper ore. It is a two stage process with a rougher stage followed by a cleaner stage. The cleaner tailings are returned to the rougher flotation. Both stages are non-reactive unit operations and both..
When is the rider going to reach the stopping point : If we apply a breaking system to a skateboard while the speed of the skateboard is 5Milies per hour, the rider average weights is 180bounds while his height is 170 cm

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find summer values for oxygen tranfer-hp and airflow rate

A fine-bubble aeration basin has a flow of 21.5 mgd, an influent BOD of 180 mg/l, 31 mg/l of mmonia, and effluent of 10 mg/l. During the winter, the wastewater temperature of 14.8 degrees C does not nitrify.

  What might account for the errors in the estimation

A projectile is fired into a block of wood that is hanging on the end of a light rigid rod. How you would estimate the speed of the projectile. What might account for the errors in your estimation.

  Determine the critical depth with a bottom width

a channel which has a trapezoidal cross-section with a bottom width of 6 m and side slopes 1:2 discharges water at a rate of 5 m3/s. Determine the critical depth.

  Determine the time required to bring the train to a stop

The subway train shown is traveling at a speed of 30 mi/hr in the west direction when the brakes are fully applied on the wheels of cars B and C, causing them to slide on the track, but are not applied on the wheels of car A.

  Determine the irr of building the corrosion-resistant tower

HZ Wireless must rebuild a cell tower recently destroyed by a tornado. A tower made of normal steel (NS) will cost $30,000 to construct and should last 15 years. Maintenance will cost $1000 per year.

  Determine present worth of costa for purchasing the analyzer

At the end of the first 5 years, the company upgraded the analyzer at a cost of $10,000. Following the upgrade the lab purchased another 5 year maintanence contract for $1000 a year, payable at the end of each year.

  Estimate the settlement of the footing four years after

A proposed square footing 2 meters by 2 meters carrying a total load of 800 kN is to be constructed on a sand deposit. The depth of the footing will be 1 meter below the ground surface

  Estimate the time of submersion in years

A piece of corroded steel plate was found in a submerged ocean vessel. it was estimated that the original area of the plate was 62.5cm 2 and approximately 2.8k had corroded away during the submersion. Assuming a corrosion penetration rate of 5.1mm/yr..

  What would the gross truck mass when loaded to heap capacity

If a truck has a capacity of 24m^3 (Heaped) and 18m^3 (struck), with a total empty weight of 31600kg (truck), and needs to move soil at a density of 1850kg.m^3 (Bank) with a swell of 41%

  Determine the hydraulic conductivity of the sand

The maximum dry density determined in the laboratory for a quartz sand is 1800 kg/m^3. In the field, if the relative compaction is 90%, determine the hydraulic conductivity of the sand in the field compaction condition

  How to estimate for the loaded machines on level ground

Stripping overburden in the Illinois coal belt, the Dusty Coal Company uses 270-horsepower, track-type tractors (with direct-drive transmissions) and drawn scrapers.

  What is the cost of heating energy in dollar per million btu

if gas is available at $0.50 per therm and the efficiency of utilization is 80 percent, what is the cost of heating energy in dollars per million Btu

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd