Reference no: EM131692000
Question - Upper Central Consultancy (UCC) wishes to bid for a market research project. The cost estimates on which UCC will base its bid are shown below:
- 275 hours work in initial data collection and preparation of research questionnaire. The hours are broken down as follows:
- 135 hours are available from existing staff that are not currently utilized. Their total employment cost is £22 per hour.
- 140 hours will have to be bought in from a Temporary Staff Agency for a cost of £16 per hour.
UCC's in-house existing library resources will be utilized to provide data for the project. The research data that will be used was purchased some months previously at a cost of £2,050. The data has never been used before and is unlikely to be used again. An additional updated report will however have to be purchased at a cost of £500.
Printing and postage of questionnaires will incur a cost of £1,100.
The in-house computer processing facility will process returned questionnaires. The computer facility makes an internal charge of £2,000 for each survey it processes.
The consultancy will have to purchase a specialist software package to undertake the sophisticated statistical analysis required at a cost of £1,750 and incur training costs of £600 to learn how to use the package. The package may be used again in the future.
A manager will be involved in the detailed planning, design and logistics for the research. The management time has been costed at 14 days @ £550 but he is very busy and will have to be remunerated through overtime at an additional cost of £3,500 in order for him to carry out other work that he is committed to complete.
A partner will supervise the whole project. An estimate of her time has been costed at £1,600 although the consultancy will not incur any additional costs for the project.
Using all of the above information, calculate the cost for the market research project based on absorption costing principles. Please detail all of your work.
|
Discuss the key performance measures of a balanced scorecard
: ACCT505 – Managerial Accounting - discuss the key performance measures of a balanced scorecard. Then, find three companies that are currently using a Balanced
|
|
What is the probability the ships will sail full
: Economists believe the dollar has a 0.23 chance of appreciating against European currencies soon. What is the probability the ships will sail full?
|
|
What is the probability that the door will actually open
: When the door should open, a green light will appear with probability 0.98. When the door should not open, a green light may still appear.
|
|
What specific methods does dr.chagnon use to study
: Identify and discuss the paradigm that Dr. Chagnon appears to be drawing from in answering questions about Yanomamo culture
|
|
Calculate the cost for the market research project
: Using all of the above information, calculate the cost for the market research project based on absorption costing principles. Please detail all of your work
|
|
Find probability that a real emergency situation exists
: A chemical plant has an emergency alarm system. When an emergency situation exists, the alarm sounds with probability 0.95.
|
|
The companys activity-based costing system
: Using the companys activity-based costing system, compute the customer margin of Wave Rider - Management would like an analysis of the profitability
|
|
Great recession employment tanked
: During the "Great Recession", employment tanked, with people losing their jobs in record numbers.
|
|
What is the working average cost of capital for this company
: Consider a company financed with 0.7 equity, 0.1 preferred stock, what is the working average cost of capital for this company
|