The magnitudes of the force P and couple C are 500 lb and 1200 lb · ft, respectively. Calculate the combined moment of P and C about

(a) the origin O; and

(b) the axis OF.

2224_ac4c0882-7e57-4427-b1d2-c54fd08f629e.png

Reference no: EM131287143

Questions Cloud

Find the distance x and the magnitude and direction of r : The three forces of magnitude P can be replaced by a single, equivalent force R acting at point A. Determine the distance x and the magnitude and direction of R.
Why are training and experience so important at ups : How do practices such as internal promotion and assignment of broad job duties help UPS achieve its competitive business strategy?How do the human resource practices at UPS help build teamwork?
Compute break-even point-proposed new break-even point units : Shawn Pen & Pencil Sets Inc. has fixed costs of $500,200. Its product currently sells for $22 per unit and has variable costs of $9.80 per unit. Mr. Bic, the head of manufacturing, proposes to buy new equipment that will cost $480,000 and drive up fi..
Six potential sources of power : Individuals have six potential sources of power, including legitimate, reward, coercive, expert, information, and referent power. Influence tactics are the way that individuals attempt to influence one another in organizations.
Calculate the combined moment of p and c : The magnitudes of the force P and couple C are 500 lb and 1200 lb · ft, respectively. Calculate the combined moment of P and C about the axis OF.
Approximate economic order quantity : A certain type of computer costs $800, and the annual holding cost is 20%.Annual demand is 9,000 units, and the order cost is$200 per order. What is the approximate economic order quantity?
What is the amount of insurance expense : On May 1, a two-year insurance policy was purchased for $19,200 with coverage to begin immediately. What is the amount of insurance expense that would appear on the company's income statement for the first year ended December 31?
Project baselines and monitoring-controlling project : Based on what you have read this week on project baselines and monitoring and controlling a project (LO5), discuss what the term contingencies mean? Should contingency costs be included in a project proposal or budget? Why or why not?
Outline discipline advertised positions in your service area : Outline discipline advertised positions in your service area. List options for practice settings and reimbursement for services. This information will be presented as a formal research paper OR as a power point presentation to class.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Why should the direction of access ramps be sloping down

In designing of access ramps for drainage channels, why should the direction of access ramps be sloping down towards downstream?

  Calculate detention time nd horizontal flow-through velocity

45 ft wide, and 14 ft deep and treats 10 mgd. The power input to provide paddle-blade velocities of 1.0 and 1.4 fps for the inner and outer blades, respectively, is 930 ft'lb/s.

  Calculate the fuel load density and the opening factor

A hotel room has a floor area of 10 m by 4 m and is 2.5 high and has a window which is 1.6 m high and 3 m wide. The room contains some furniture and other commodities containing 50 kg polyurethane with 25 MJ/kg and 350 kg wood with 18 MJ/kg.

  Design a concrete footing to support a 16in by 16 in column

Design a concrete footing to support a 16in by 16 in column that is 13 feet high with f'c= 6000 psi. The footing has a f'c=3000psi. Assume the the footing base is 5 ft below the grade and the soil is 100 lb/ft with an allowable pressure of 4500lb/ft ..

  What is the ultimate cbod 40 km downstream

A river flowing with a velocity of 20 km/d has an ultimate CBOD of 20 mg/L. If the organic matter has a decay coefficient of 0.2 day-1, what is the ultimate CBOD 40 km downstream?

  What is the maximum shear stress in the magnesium

A hollow magnesium shaft is rigidly bonded to a solid steel shaft and rigidly mounted between two supports. A torque of 500 NA·m is applied at the junction between the two shafts. What is the maximum shear stress in the magnesium?

  What input of power rating is required for the pump

A water storage tank located on a larege dairy farm has a storage capacity of 0.1 ML. The average rate of water consumption from this tank is 6.25 kL per day, every day.

  What is the uniform deterministic arrival rate

what is the uniform deterministic arrival rate if the vehicle queue is cleared in 35 minutes after vehicles begin to arrive (in veh/min.)?

  Determine va and the time of the flight

The skateboard rider leaves the ramp at A with an initial Velocity Va at a 30 degree angle. If he strikes the ground at B, determine Va and the time of the flight.

  Magnitudes of the additional loads

Determine the magnitudes of the additional loads that must be applied at B and F if the resultant of all six loads is to pass through the center of the mat.

  What size pipe should be used from a ground storage tank

Water flows from a ground storage tank that is 450 feet above a town's water distribution system. The pressure at the entrance of the system must be at least 75 psi and the demand is 1350 GPM.

  What will be the discharge through the pipe

A pump having the characteristics given ( N=2133.5 rpm, n=35.6 rps, D=37.1 cm) pumps water at 25 degree C from a reservoir at an elevation of 366 m to a reservoir at an elevation of 450 m through a 36 cm steel pipe

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd