Calculate direct materials cost and efficiency variances

Assignment Help Accounting Basics
Reference no: EM131809619

Assignment

This continues Daniels consulting situation. Assume Daniel has created a standard cost for each job. Standard direct materials per job include 10 software packages at a cost of $900 per package. Standard direct labor cost per job include 105 hours at $100 per hour. Daniel plans on completing 12 jobs during March 2018.

Actual direct materials costs for March included 90 software packages at a total cost of $81,450. Actual direct labor costs included 110 hours per job at an average rate of $107 per hour. Daniels completed all 12 jobs in March.

Requirements:

1. Calculate direct materials cost and efficiency variances.

2. Calculate direct labor cost and efficiency variances.

3. Prepare journal entries to record the use of both materials and labor for March for the company.

Reference no: EM131809619

Questions Cloud

Spoke system as opposed to the point to point system : What is the Hub and Spoke System as opposed to the point to point system?
Repairs on the outlet works of a small dam : A decision has been made to perform certain repairs on the outlet works of a small dam. For a particular 36-inch gate valve, there are three available
How large does the class have to be to make probability : Suppose you are one of n students in a class. What is the chance that at least one other student has the same birthday as yours?
What is each alternative IRR : Capitol Healthplans, Inc., is evaluating two different methods for providing home health services to its members. What is each alternative's IRR
Calculate direct materials cost and efficiency variances : Calculate direct materials cost and efficiency variances. Prepare journal entries to record the use of both materials and labor for March for the company.
Floodproofing of the building : You have been brought in as a consultantto determine whether floodproofing of the building is economically justified. The alternatives are as follows:
Flood protection for the area below the dam : Five years ago a dam was constructed to impound irrigation water and to provide flood protection for the area below the dam.
Product initial useful life : How much is it worth to the firm to be able to extend the product's life by 3 years, at a cost of $50,000, at the end of the product's initial useful life?
Develop the adjusting entry at the end of the first month : The rent is prepaid for three months at $1,200 per month. Develop the adjusting entry at the end of the first month that rent should be applied

Reviews

Write a Review

Accounting Basics Questions & Answers

  How much control does fed have over this longer real rate

Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest.   How much control does the Fed have over this longer real rate?

  Coures:- fundamental accounting principles

Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.

  Accounting problems

Accounting problems,  Draw a detailed timeline incorporating the dividends, calculate    the exact Payback Period  b)   the discounted Payback Period. the IRR,  the NPV, the Profitability Index.

  Write a report on internal controls

Write a report on Internal Controls

  Prepare the bank reconciliation for company

Prepare the bank reconciliation for company.

  Cost-benefit analysis

Create a cost-benefit analysis to evaluate the project

  Theory of interest

Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR

  Liquidity and profitability

Distinguish between liquidity and profitability.

  What is the expected risk premium on the portfolio

Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.

  Simple interest and compound interest

Simple Interest, Compound interest, discount rate, force of interest, AV, PV

  Capm and venture capital

CAPM and Venture Capital

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd