Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The moist unit weight of a soil is 119.5 pcf. For a moisture content of 12% and Gs=2.65, calculate the following;
a) void ratio
b) porosity
c) degree of saturation
d) dry unit weight
A Charpy V Notch test was conducted for an ASTM A572 Grade 50 bridge steel. the average values of the test results at four different test temperatires were found to be
For an intermediate beam in 3 bays by 3 bays (each bay is 20' by 20') floor plan, draw the envelope shear and moment diagrams taking into account effect of pattern loading.
The coordinates for station A are 1023.34 N and 988.56 E. What are the northing and easting coordinates for station B that is located 40 feet due east of A, and 22.32 feet due south of A
could you please help me to figure out what the meaning of steady state in the pavement management system preservation and rehabilitation.
A PVC pipe has an inside diameter of 40 mm, is 30 m long and carries 10°C water at a rate of 3.5 m3/hr. At this rate, the friction factor of the pipe is 0.0814.
A 12in diameter water main in your city has become very rough due to rust and corrosion, it has been suggested that the flowrate through the this pipe can be increased by inserting a smooth plastic liner into the pipe.
A city is subjected to occurrence of hurricane and tornado with the average probabilities of 0.3 and 0.2 per year, respectively. Assume occurrence of these events is statistically independent.
An aircraft has a glide ratio of 12 to 1. (glide ratio means that the plane drops 1m for every 12m it travels horizontally.) A building 45m high lies directly in the glide path to the runway.
If t his house were heated instead by a heat pump that has an average COP of 2.4, determine how much money the homeowner would have saved that month. Assume the price of electric power is $0.085 per kW - hr.
A community has a current population of 15,000. 10 years ago, the population was 12,500 and the community has a declining growth rate with a saturation population of 22,000.
In this assignment you are a recent graduate and have been hired as an industrial engineer and your job is to set up the plant to produce a new product.
if the subgrade has a resilient modulus of 103,500kN/m2, design a suitable pavement consisting of a granular subbase with a layer of coefficient of 0.13, a granular base layer with a layer coefficient of 0.14, and an asphalt concrete surface with ..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd