Build an air ventilation system

Assignment Help Other Engineering
Reference no: EM13979291 , Length: word count:8000

Engineering dissertation of 8000 words, excluding tables and diagrams. with a drawing on CAD. mostly preferred Solid works.

Please find the poster for further reference.

Poster Project - Smoking during long distance flights

Introduction:

Originally inflight smoking was permitted for travellers in all flights. In 1988 the United States banned smoking in domestic flights until the year 2000 when all international flights banned smoking during flights because all the smoke was retained within the cabin because there was no air recirculation filter. The main reason that caused it was to save money by changing the air in the cabin less frequently. People who smoke get frustrated when not allowed to smoke, especially during long distance flights and many avoid travelling for this reason. If a company offered this service it would benefit them economically because many smokers will prefer to travel with that company.

Background research:

The first time it was considered to ban smoking during flights was in 1972 in which a flight from Rio de Janeiro to Paris had to make an emergency landing due to too much smoke in the cabin which caused 123 people to die. The problem at the time was that the technology on air ventilation was not as good as nowadays. But with the technology we have today it is possible to have a good air ventilation system for smoking on airplanes and can also split the cabin into two parts; smokers and non-smokers, with different air ventilation systems in both cabins.

1266_Air ventilation system.png

Aims and objectives:

The main aim of this project is to build an air ventilation system that will allow people to smoke during flights.

The objectives are:

• Research for anything relevant to the project

• Make different concepts and solutions to this problem

• Analyse and appraise the concepts to decide on best solution

• Develop the favoured and most suitable concept into a practical solution

• Carry out detailed costing of final concept

• Carry out a survey to smokers and non-smokers

904_Air ventilation system1.png

Future work:

1. Survey for smokers and non-smokers

2. Research for types of smoke ventilation systems

3. Make Concept designs - at least 3 designs

4. Choose best suitable design

5. Sketch 3D/2D design

6. Costs

Conclusion:

To conclude so far on this project, it is desirable by smokers to smoke during long lasting flights and when it comes to the airlines, the passengers' satisfaction comes first which means they would consider this solution.

Reference no: EM13979291

Questions Cloud

Can vaidman first electric ab effect gedanken experiment : Is it possible to explain within this formalism the experiments of Tonomura et al. (Phys. Rev. Lett. 56 no. 8, pp. 792-795 (1986)), who used a superconductor to completely shield the magnetic field of the source?
What steps are considered as important to a disaster : What steps are considered as important to a disaster recovery plan?
Analyze what motivates that organization to bring changes : Thoroughly analyze what motivates that organization to bring changes and what kind of support that organization gets in order to incorporate changes. Does that company consult any OD practitioner to guide about the change if yes, then how it moved..
Considering that poverty rates for some groups : Considering that poverty rates for some groups have gone down over the last 40 years, and have remained stable for everybody else, yet the overall poverty rate is still about 15%. Discuss whether you think we can ever get the poverty rate below 10%? ..
Build an air ventilation system : Analyse and appraise the concepts to decide on best solution - develop the favoured and most suitable concept into a practical solution and to conclude so far on this project, it is desirable by smokers to smoke during long lasting flights and when ..
Cost cooperatively through waiting cost savings : The wheat harvesting season in the American Midwest is short, and most farmers deliver their truckloads of wheat to a giant central storage bin within a two-week span. It will cost $200,000 to enlarge the bin during off-season. How long will it take ..
Business week section business exchange : Step - 1: Review this article from on line Business Week Section Business Exchange: Harness the Power of Marketing
Three major causes of inequality of income : Three major causes of inequality of income. Describe what the primary factors are that lead to poverty. We have learned there are two solutions to reduce poverty. We could expand welfare and redistribution programs, and make taxes more progressive. C..
Discuss the structure of the horse industry : Compare and contrast it with the other animal industries discussed thus far. Please discuss two things your learned or found interesting during your tour of the OSU Horse Center.

Reviews

Write a Review

Other Engineering Questions & Answers

  Comparative study of the use of replacement pile foundations

Pile Foundations Part two of the project requires the students to prepare a comparative study of the use of replacement pile foundations versus displacement techniques.

  Problem regarding the comparative cost assessment

Perform a comparative cost assessment for both power plants by considering the energy resources. Perform a comparative environmental impact assessment for both power plants by considering the energy resources.

  Plot a graph using scilab script and include it in

Prepare a Scilab script to evaluate the volumetric flux of smoke in a plume produced by a fire of given HRR Q'' The plume loses a percent of its heat by radiation and ß percent by other means.

  Determine the diameter of the follower wheel

As cam A rotates, follower wheel B rolls without slipping on the face of the cam. Knowing that the normal components of the acceleration of the points of contact at C of the cam A and the wheel B are 0.66 m/s2 and 6.8 m/s2, respectively, determine..

  Design a multiphase flow meter component

To research Literature review on the current Multiphase flow meters sensors in the oil and gas industry - design a multiphase flow meter component using CATIA V8, subjecting it to the loading modes in the marine environments.

  Determine the centre of pressure on immersed surfaces

Determine the hydrostatic pressure and thrust on immersed surfaces and Determine the centre of pressure on immersed surfaces - What happens if the cube is placed in salt water and calculate the hydrostatic pressure on the drum

  Assignment philosophythis year there has been an attempt to

assignment philosophythis year there has been an attempt to replicate a real world aerospace engineering task. the

  Formulate the above problem mathematically and formulate

problem 1 the board of directors of general wheels co. is considering seven large capital investments. each investment

  Determine the mach number

Carbon dioxide enters an adiabatic nozzle at 1200 K with a velocity of 50 m/s and leaves at 400 K. Assuming constant specific heats at room temperature, determine the Mach number (a) at the inlet and (b) at the exit of the nozzle.

  What are the benefits from incorporating turbochargers

What are the benefits from incorporating turbochargers in 2-stroke slow- speed engines, and what are the potential safety hazards arising from their operation?

  When and where the bus passed the truck

A bus is parked along the side of a highway when it is passed by a truck traveling at a constant speed of 70 km/h. Two minutes later, the bus starts and accelerates until it reaches a speed of 100 km/h, which it then maintains. Knowing that 12 min..

  Prepare a report on sensors in the multi pump system

Prepare a report on Sensors in the Multi Pump System - summary should state the purpose of the paper.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd