You are studying a 3-km stretch of stream that is about 35 m wide. A gaging station on the stream provides you with an estimate that the average flow rate during your study was 3 cubic meters per second (ems). You toss a float into the stream and observe that it takes about 2 hr to traverse the stretch. Calculate the average velocity (rnps), crosssectionalarea (rn"), and depth (m) for the stretch. To make these estimates, assume that the stretch can be idealized as a rectangular channel.
The total flow then moves to a point W on the traction drive two metres off the ground, and travels through a nine millimetre diameter conduit. Ignoring all friction and minor losses, determine the pressures at points H and W.
How much money should an environmental soil cleaning company borrow to finance a site reclamation project if it expects revenue of $140,000 in the first year increasing by 3% per year over the 5-year cleanup period? The interest rate is 8%.
The dye appears 14 days later in an observation well 75 ft away from the injection point. Compute the seepage velocity and estimate the hydraulic gradient in the aquifer if the porosity of the soil is 42%.
In an unconfined aquifer having K = 30/m/day, two observation wells, 3km apart, have water levels of 50 and 40 m, respectively, above the base of the aquifer. Determine the rate of flow.
If the overall gear reduction ratio is 8 to 1, what is the maximum acceleration from rest (in ft/sec^2) for: a) the car with the base engine? b) car with the modified engine? Assume the car is on good dry pavement.
A fluid flowing in a pipe 30cm in diameter has a uniform velocity of 4m/s. The pressure at the center of the pipe is 40KPa, and the elevation of the pipe's centerline above an assumed datum is 4.5m. Compute the total energy per unit weight of the ..
What are Engineering Societies based upon the research? List at least 10 discipline specific engineering societies along with their website addresses.
The void ratio of soil in the borrow pit is 1.12. Estimate the volume of soil (cubic meters) that must be excavated from the borrow pit.
At the end of 15 years, the first motor will have a salvage value of $50 and the second motor will have a salvage value of $100. consider the MARR to be 8%. (note : 1HP=0.7457 kw). Determine which motor should be installed based on the PW criterio..
In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.
Give one possible characteristic or property of sanstone and of the quartzite that made you decide not to select it for your concrete project?
What do you understand by the term durability? Compared to other considerations, how much importance should be given to durability in the design and construction of concrete structures?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd