6:Resource -Leveled Gantt Chart
Assuming that one worker is required for each activity, prepare a resource-leveled schedule. What is the maximum number of workers required to finish the project on time? Show all work and provide a completed Gantt chart using Excel.
7: CPM NETWORK ANALYSIS
Given the data in the table below, perform a critical path analysis to determine the project's critical path. Draw a AON project network diagram for the project. Identify all of the possible paths, duration of each path, and identify the critical path. Calculate and indicate the ES/EF schedule, LS/LF schedule, and slack. Show all work and provide a completed Gantt chart of the CPM Network Analysis. Note: Use the drawing tool in Word, Excel or PowerPoint to draw the diagram. Use Excel to create a Gantt chart.
Activity
Duration
Predecessor(s)
A
3 weeks
--
B
15 weeks
C
5 weeks
D
E
6 weeks
F
4 weeks
G
2 weeks
D, F
8: PERT ANALYSIS
Using the following data values for minimum expected activity durations and maximum expected activity durations, provide a PERT analysis of the network analysis given in question 7. Include all calculations and show all work.
Minimum Duration
Maximum Duration
2
4
12
18
3
7
8
5
1
Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest. How much control does the Fed have over this longer real rate?
Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.
Accounting problems, Draw a detailed timeline incorporating the dividends, calculate the exact Payback Period b) the discounted Payback Period. the IRR, the NPV, the Profitability Index.
Term Structure of Interest Rates
Write a report on Internal Controls
Prepare the bank reconciliation for company.
Create a cost-benefit analysis to evaluate the project
Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR
Distinguish between liquidity and profitability.
Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.
Simple Interest, Compound interest, discount rate, force of interest, AV, PV
CAPM and Venture Capital
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd