Tracking direct materials, Cost Accounting

Tracking Direct Materials

Jack keeps full records of the material released to each job. When Donnie gathered up light bulbs, tape, breakers, wire, and wire nuts on the morning of the 14th, some system required to be in place to "check out" this material. The document which is used for this process is known as the "materials request" or "materials requisition" form. This form will show which material is leaving the available raw materials stock and being put into the production. At times a separate form is prepared for every item, and sometimes a running list similar to the given below is used:

Castle Electric        Materials Requisition

Employee:  Donnie Odom

2240_Direct materials.png

This form gives essential documentation to safeguard and track the inventory; a manager who fails to control and monitor the inventory does so at great peril! It also reveals that "direct material" for the billboard task (Job A) was $150 i.e. the light bulb. The wire nuts and tape might have been used on the billboard will be dealt with as an overhead which is discussed later.

Before moving on to overhead, you are required to know one more thing about the "materials requisition" form; although illustrated form lists material cost, which will not always be the case. At times, a business may not be particularly interested in letting employees to see the cost information, or cost information may not be readily obtainable. In any of the case, the form will instead comprise a part or the serial number. A subsequent clerical task will be to recognize the cost of the particular parts which were put into the production. Great care should always be taken to match right cost to the right item, and in right quantity. For instance, the 500 feet of wire might be on one roll, but it is priced by the foot, and quantity must be 500 feet, not 1 roll; the job cost calculation would be bit incorrect if only $0.14 were assigned to one roll of the wire!

Posted Date: 7/21/2012 5:12:50 AM | Location : United States







Related Discussions:- Tracking direct materials, Assignment Help, Ask Question on Tracking direct materials, Get Answer, Expert's Help, Tracking direct materials Discussions

Write discussion on Tracking direct materials
Your posts are moderated
Related Questions
What is a standard and acceptable variance

Standard Cost Card It is a card record of the Standard or expected costs in producing a specified output.  This gives the physical quantities of inputs and also their monetary

The following standard costs were developed for one of the products of Ferrars Company: Standard Cost Card Per Unit Materials: 4 feet x $14.25 per foot $ 57.00 Direct labor: 8 hour

At the beginning of 2010, Mirror Corporation, had undepreciated capital cost (UCC) of $1,575,000 in asset Class 38 with a CCA rate of 30%. On April 15, 2010, Mirror sold an asset t

Variable Costs Are costs such raise or fall proportionately along with the level of activity that is such portion of the cost of an activity which changes along with the leve

Assets                                               2011                                                                        2010 Non Current Assets

Advertising expense $17,200 Wages expense-assemblers 36,840 Depreciation expense-machines 21,480 Utilities expense-factory 21,120 Wages expense-lathe operators 23,480 Repair expens

what is Taylor''s differential piece rate plan

Walter manufactures a silicone paste wax that goes through three processing departments: cracking, blending, and packing. All raw materials are introduced at the start of work in t

Reamer Company uses a predetermined overhead rate based on machine-hours to apply manufacturing overhead to jobs. The company has provided the following estimated costs for next ye