open chanel flow, Civil Engineering

A rectangular channel is 3 m in width and draws water from a lake. The channel slope is 0.001 and the Manning’s n is 0.0013. What will be the discharge in the channel when the lake level is 2 m above the high point of the channel bottom? Neglect the inlet lossestion
Posted Date: 3/31/2013 2:47:53 AM | Location :







Related Discussions:- open chanel flow, Assignment Help, Ask Question on open chanel flow, Get Answer, Expert's Help, open chanel flow Discussions

Write discussion on open chanel flow
Your posts are moderated
Related Questions
Choice of Pavement: The advantages and drawback of the two types of pavements are summarized in Table, to enable a choice to be made. Table : Advantages and drawback of

Uses of Lime Uses of lime in civil works are following : For making mortar  for masonry works and plastering For white washing. For soil stabilization. To produc

Explain Fluidized-Bed Incinerators sand is heated to 800C by oil or gas and blown around (fluidized) by a blower that sends air from bottom upward heated fluidized san

Question Geotechnical Instrumentation is often employed for monitoring state of reclamation . From time to time two piezometers are installed inside same borehole. What is mai

Similarity between post and pre tensioned concrete In the case of  pre-tensioned concrete members, a pattern of  small length and  small width cracks which are more in numbers

what are the factors which influence the efficiency of the turbine?

What is the safe bearing capacity of a rectangular footing, 1 m × 2 m, placed at a depth of 2 m in an saturated clay having unit weight of 20 kN/m 3 and unconfined compression str

The survey has identified the beginning and ending points along an urban arterial highway that require new sidewalks. The first station is located at 5+88 and the second station is

Question Give genuine reason that why are steel tubular marine piles often driven open-ended? Answer In marine structure where piles are constantly topic to major la

Define the Arrow Diagramming Method Activity-on-Arrow (Branch) with nodes as dependencies Uses finish-to-start precedence only. The solution method for an activity on