A device used to anchor tendons at the end of a concrete member is called as an anchorage in the case of post-tensioned concrete. In the case of a pre-tensioned concrete member, an anchorage is a device used to anchor stretched tendons during hardening of concrete.

 


Related Discussions:- Explain in brief about the term - anchorage

Euation solving, IFC= f(Ptr,Paccs+Peng) where ptr = 8, paacs =5 and peng =2...

IFC= f(Ptr,Paccs+Peng) where ptr = 8, paacs =5 and peng =2 In this eqn. what does comma means and how to solve this eqn.

Estimation of loading carrying capacity, Question While designing mini...

Question While designing mini-piles , should strength of grout be disused during estimation of loading carrying capacity? Answer While designing min-piles, there will

Inspection and quality control certificate, Q. Inspection and Quality Contr...

Q. Inspection and Quality Control Certificate : A 'lot' under inspection should be accepted by the inspector when no defect is found in the acceptance level tests and so certif

Project management, planking and strutting for shallow excavation

planking and strutting for shallow excavation

Pre-tensioned concrete elements, Pre-tensioned concrete elements It is ...

Pre-tensioned concrete elements It is the act of transferring the stress in prestressing tendons to the concrete member. In the case of pre-tensioned concrete elements, this st

Extreme fiber stresses at the mid span section of the beam, Extreme fiber s...

Extreme fiber stresses at the mid span section of  the beam A pre-stressed concrete beam, of  cross section 300 mm x 500 mm and 8 m span, is pre-stressed with a parabolic tend

Define the equations for a contracted rectangular weir, Define the Equation...

Define the Equations for a Contracted Rectangular Weir If the rectangular weir is a contracted weir and the flow is restricted from passing freely through the weir opening, a r

Calculate the equivalent uniform annual cost, A contractor purchased an exc...

A contractor purchased an excavator for $100,000. The life expectancy is 10-years. With the annual interest rate at 7%, the annual cost for the excavator is most nearly: Solutio

Calculate the invert elevation of the sewer pipe, 1. The center line elevat...

1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft.   The existing ground top of cut elevation (ft) is most nearly: 2. A design engineer c

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd