Correction for construction period, Civil Engineering

Assignment Help:

You are aware that construction of any type of structure takes sometime. Pressure due to the building will be applied gradually and not instantaneously. Excavation for the construction of the foundation is essential. This results in the release of pressure. Hence, original pressure is reached gradually as the construction progresses. Later on, it gradually increases the pressure. Figure shows the rate of loading as the construction activity progresses. The expansion and recompression due to excavation and construction upto ground level is normally neglected. The loading period is considered as effective when the construction advances above ground level.

1191_Correction for Construction Period.png

From Figure, it is ,clear that finishing rate of load increment is considerably decreased. Hence, effective loading period is to be considered.


Related Discussions:- Correction for construction period

Earth fill dams, Ask question #Minimum 100E. The regulations and specificat...

Ask question #Minimum 100E. The regulations and specifications that followed for compaction works for earth dam in Oman words accepted#

Indicate quality of rock foundation, Question During piling works, norm...

Question During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by

Airport management, Airport Management: Airlines (a)        Adequ...

Airport Management: Airlines (a)        Adequate space for each airline for ticketting, check-in and baggage handling, and (b)       Adequate space for airline staff.

State about the pre-tensioned concrete beam, State about the pre-tensioned ...

State about the pre-tensioned concrete beam A pre-tensioned concrete beam, 200 mm wide and 300 mm deep, is prestressed by straight wires carrying an initial force of 150 kN at

Trusses design, does the truss pitch relate to the building''s height?

does the truss pitch relate to the building''s height?

Determine the bar sizes and spacing, Referring to problem 1, in order to me...

Referring to problem 1, in order to meet a 1-hour fire code rating the slab thickness must be at least 4.00. Based on the information given in problem 1 and with a slab thickness o

HIGHWAY CONSTRUCTION & MAINTENANCE, what is the difference between feasibil...

what is the difference between feasibility study and traffic counting

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd