Tests on cement, Civil Engineering

Tests on Cement:

The following tests are conducted on cement in a project site:

Setting Time

  • Initial setting time
  • Final setting time

Compressive Strength

Other tests such as Fineness and Soundness are conducted by the manufacturers who issue a test certificate when cement is delivered.

Posted Date: 1/22/2013 3:02:35 AM | Location : United States







Related Discussions:- Tests on cement, Assignment Help, Ask Question on Tests on cement, Get Answer, Expert's Help, Tests on cement Discussions

Write discussion on Tests on cement
Your posts are moderated
Related Questions
One nautical mile is described by one latitude minute of arc (there are 60 like minutes to a degree). This equals 1852 meters, and roughly (but coincidentally) 2000 yards or 6000 f


Define the term - Clamp splice In a Clamp splice, bolts and nuts alongwith clamp plates are used. Tendons are held in-between the clamp plates and these clamp plates are tighte

Determine the term - Final Tension The tension in tendons after losses of prestress have taken place is called as final tension. Final tension is taken to be corresponding  to

Calculate the change in volume: If the bar is 1 m long with rectangular cross section of 300 mm deep and 400 mm wide, compute the change in volume of the solid because of a lo

difference between flat slab and normal slab

underground installations

stundarad Ratio of concrite?

A five-mile long section of two-lane road has an AADT of 8,000.  There have been six crashes on this section of road during the past two years.  What is the crash rate? R sec

Sketch typical complete grain-size distribution curves for (i) well graded soil and (ii) uniform silty sand. Form the curves, evaluate the uniformity coefficient and effective size