Synchronization latency problem, Computer Engineering

Synchronization Latency Problem: If two simultaneous processes are performing remote loading, then it is not recognized by what time two processes will load, as the issuing processor requires two remote memory loads by two processes together for a few operation. That means two simultaneous processes come back the results asynchronously and this causes the synchronization latency for the processor.

 

Posted Date: 3/4/2013 5:51:57 AM | Location : United States







Related Discussions:- Synchronization latency problem, Assignment Help, Ask Question on Synchronization latency problem, Get Answer, Expert's Help, Synchronization latency problem Discussions

Write discussion on Synchronization latency problem
Your posts are moderated
Related Questions
What are the advantages and disadvantages of macro pre-processor? Advantages Any of existing conventional assembler can be improved in this way to incorporate macro proces


assignment on transaction flow, transform flow, transform mapping: refining the architectural design

Write Hit Policies: Write through o   Update next level on every write o   Cache is always clean o   A lots of traffic to next level (mostly write) Write

what is the use of d-flipflop in associative memory

what are the applications of photochemistry?

Explain the Trackball and Thumbwheel devices  Joysticks A joystick consists of a small, vertical lever (called the stick) mounted on a base that is used to steer the screen

Define bootstrap loader? The ROM portion of main memory is required for storing an initial program known as bootstrap loader. It is a program whose function is to start the com

Trunks are the lines that run between (A)  subscribers and exchange        (B) switching system and power plant (C)  Local Area Network                (D) switching syste

What is referred as memory mapped I/O. The case in computers that employ only set of read and write signals and do not differentiate between memory and I/O address. This is kno