surveying, Civil Engineering

dumpy level and its procedure
Posted Date: 1/6/2013 8:42:46 AM | Location : USA







Related Discussions:- surveying, Assignment Help, Ask Question on surveying, Get Answer, Expert's Help, surveying Discussions

Write discussion on surveying
Your posts are moderated
Related Questions

Calculate the moment of inertia and section modulus (top and bottom of the beam) about the z-axis of the beam cross section of Fig.

Define the Pressure on a vertical plane Fluid pressure increases linearly with increasing depth. The average pressure on a vertical plane occurs at the average vertical depth.

Q. What is Material at site Return? The authority is executive charge of a work should be responsible for holding in safe custody for controlling the consumption and to the ext

#question.Techniques of Operations Research - Transportation Problem, Transportation Models Transportation Problems Transportation plays an important role in our econ

Define Lead Lag Relationships 1. A lead is when the successor task begins before the predecessor task is complete 2. A lag is when a successor task does not

Q. Purpose of tar in bituminous materials? Tar is usually incorporated in bituminous materials due to the below reasons: (i)  Blending of tar with bitumen possesses better b

brief detail about ships stresses

what are the characteristics of the beam to column connection?

Sir how can we find location of neutral axis for a curved beam of circular cross section,,,