Waterfall Model It is the oldest, simplest and most widely used process model. In waterfall model, every phase of the life cycle is finished before start of a new phase. It's

what is meant by 345 rule in IEEE 802.3 ?

QUESTION - Characteristics of DSs (a) List and describe any 4 characteristics of distributed systems. (b) State the criterion for a system to be considered as not a distrib


Level 2 (Repeatable) Organisation satisfies all the requirements of level-1. At this stage, basic project management policies and associated procedures are established. Insti

Q. Consider a project for which the manpower requirement is 200 PY and the development time is 2 years. calculate the peak manning time. Ans Software Project cost K=200 PY

Q. Explain Iterative Enhancement model? This model incorporates modification in the software based on the analysis of the existing system. As well the complete documentation of

Configuration management (CM) covers the tools and procedure used to control, coordinate and track code, needs, documentation, problems, change requests, designs, tools, compilers,


Give explanation about the incremental model. - Have same phases as the waterfall model. - Phases are as follows: Analysis. Code. Design. Test. Incre