Explain different phases of spiral model, Software Engineering

Assignment Help:

Q. Explain Different Phases of spiral model?

1) Planning: In this phase the objectives alternatives as well as constraints of the project are determined or documented. The objectives as well as other specifications are fixed so as to decide which strategies or approaches to track during the project life cycle.

2) Risk analysis: In this phase every possible and available alternatives which are able to help in developing a cost effectual project are analyzed and strategies are decided to use them. This phase has been further particularly in order to identify as well as resolve all the possible risk in the project development.

3) Development: In this phase the authentic development of the project is carried out. The productivity of this phase is passed by all the phases iteratively in order to acquire improvements in the same.

4) Assessment: In this phase developed product is passing on to the customer in order to obtain customer comments as well as suggestions which can help in identifying as well as resolving potential problems or errors in the software development.


Related Discussions:- Explain different phases of spiral model

Concepts of the object-oriented paradigm, To develop software of lasting qu...

To develop software of lasting quality you have to lay down a solid architectural foundation that is resilient to change. Modelling is at the heart of the development of good quali

Various attributes of cost drivers used in cocomo model, Various attributes...

Various attributes of cost drivers used in COCOMO model are: 1.  Physical attributes: These are concerned with needed characteristics of the software product being developed.

Explain the concept of top down design, Q. Explain the concept of Top down ...

Q. Explain the concept of Top down design? Top down design: A top down design approach begins by identifying the major modules of the system decomposing them into their lower

Software quality attributes, The Clue-Less system shall be available to all...

The Clue-Less system shall be available to all users on the Internet 95% of the time between 5:00pm and midnight local time and 90% of the time between midnight and 5:00pm local ti

What is crash, The sudden and finish failure of a computer system or compon...

The sudden and finish failure of a computer system or component.

What is bottom-up strategy, Bottom-up approach, as the name suggests, is th...

Bottom-up approach, as the name suggests, is the differing of the Top-down method. This process begins with building and testing the low level modules first, working its way up

What is test methodology, Test methodology is up to the end client, and can...

Test methodology is up to the end client, and can be used, reused, and moulded to your end client's requirements. Rob Davis believes that using the right test methodology is signif

Memorandum for circulation to members, Question: You work with Mr Aksha...

Question: You work with Mr Akshay Kapoor, Human Resource Manager of an IT Company called LTZ. Mr Kapoor is the Chairperson of the Human Resource Policy Committee. Other members

Determine the level 0 and level 1 of DFD, Determine the level 0 and level 1...

Determine the level 0 and level 1 of DFD External entities provide input data for processing. During processing, some intermediate data is generated. After final processing, fi

What is live variable, What is live variable A variable is live from it...

What is live variable A variable is live from its first to its last reference within a process.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd