quantity calculation for subgrade preparation, Civil Engineering

Assignment Help:
reparation of subgrade in sqm for a road of span 12 km and width 5.25m,with shoulders of 0.75m span on both the sides...considering extrawidening too......plz help...i m preparing bill of quantities...and i need to calculate this quantity?

Related Discussions:- quantity calculation for subgrade preparation

Ocf, location of hydrolic jump

location of hydrolic jump

Design of the aeration basin based on solids retention time, Design of the ...

Design of the Aeration Basin Based on Solids Retention Time - sewer construction: You are provided the following information about a municipal wastewater treatment plant. That

Structure analysis II, To determine a trusses ,beams and frames of two degr...

To determine a trusses ,beams and frames of two degree by compatibility equations and by castiglanoes theorem

Nonsymmetrical loading of the snow, Nonsymmetrical loading of the snow ...

Nonsymmetrical loading of the snow A decrease in snow weight in some parts of a roof because of the wind, or melting from the heath, or the sun light would reduce internal powe

What do you understand by percolation of water, Q. What do you understand b...

Q. What do you understand by Percolation of water? Percolation of water into the ground or embankment takes place, causing rise in water table and / or saturation of the body.

Major compensation of using hdpe as compared with cast iron, Question N...

Question Now, mainly flap valves are ended of HDPE. What is the major compensation of using HDPE as compared with cast iron? Answer (i) It has no response with sewage

#title.cement factor, Aplease provide tables for each design mix and also t...

Aplease provide tables for each design mix and also the, high early strengh.l thanks

SETTLEMENT OF SOIL AND BRACING OF RETAINING WALL OF BASEMENT, STRUCTYRE IS ...

STRUCTYRE IS HAVING BASEMENT JUST WITH THE SIDE OF FOUNDATION WHICH CAUSED SETTLEMENT AND CRACKS IN THE STRUCTURES

Pumping at joints in concrete carriageway, Q. Pumping at joints in concrete...

Q. Pumping at joints in concrete carriageway? Pumping at joints in concrete carriageway takes place in the presence of the below factors: (i)  Fine-grained subgrade (ii)

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd