Design a 10 unit rapid sand filter system for a flow of 6.3 MGD with a filtration rate of 2 gpm/sq ft. and an L: W ratio of 1.3.
Design flow (Q) = 6.3 MGD = 6.3x106
gpd = 4375 gpm
Assume filtration rate of 2 gpm/ft2
Total filter area required = 4375 gpm/2 gpm/ft2
= 2187.5 ft2
Total of 10 filter units (but design is based on 9 filters being in operation and 1 in backwashing). In a problem you will be trying to match this with the answer
Area required per each filter unit = 2187.5/9 = 243 ft2
L:W ratio is 1.3 so LW = 1.3WxW = 1.3W2
= 243 --- this gives W = 13.7 ft and L
= 17.8 ft.
Explain Hardness - Water Softening 1) Hardness is used to characterize a water that does not lather well, causes a scum in the bath tub and leaves hard, white, crusty deposits
Economic span
industrial applications of ultrasonic welding,soldering,drilling,claning
Ask questio #Minimum 100 words accepted# what is varigon theorem and what are their application ? its examples
State the term - constant eccentricity A pre-stressed concrete beam has a width of 300 mm and an overall depth of 450 mm. The permissible stresses in tension and compression du
Q. Evaluate dimensions of apron according to Spring and Gales? Dimensions of apron according to Spring and Gales. Gales and Sethi favoured uniform thickness of laid apron while
Q. Explain the Mechanism of compaction by paver? Mechanism of compaction by paver, steel-wheeled roller and pneumatic tire rollers Paver, steel-wheeled roller and pneumat
composition of cement in cover bag should be written or not/ If written which country uses ?please specify the name ?
Light Rail Transit (LRT) Light Rail Transit is also known by the name train. LRT can be run on the surface if road space is available (as in Kolkata) or as elevated, with pil
In construction of a two-span bridge (span length = L) by using span-by-span construction, why is the length of about 1.25L bridge segment is constructed in first phase of construc
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd