Q. Process of Steam generation unit?
BFW from water treatment area is sent to the BFW Booster pumps at temperature around 105°C. The BFW is then heated and fed to the HP BFW Pumps.
Chelant and oxygen scavenger are added to inhibit scale formation and remove DO in the BFW, respectively.
The high pressure BFW is boiled in the Steam Generators to generate 80% to 100% quality steam. Wet HP steam (for steam quality less than 100%) is sent to the HP Steam Separator to remove liquid and 100% quality steam is fed to the HP steam pipelines for injection at the well pads.
Liquid blowdown from HP Steam Separator is throttled down to lower pressure and sent to the MP Steam Separator for vapour-liquid separation.
Neutralizing amine is injected into the steam condensation system to prevent corrosion. The blowdown is cooled down and fed to the Evaporator Feed Tank.
what is the difference between polar and mass moment of inertia?
Rockwel l Hardness Test: The specimen is subjected to a major load for about 15 seconds after the initial load. ASTM says 13 scales for testing of wide range of materials. Th
IGES application protocol: In the year 1977, the three authors of The Initial Graphics Exchange Specification were identified collectively for their contributions to the growt
Find out the power - hollow shaft: A hollow shaft of internal diameter 400 mm & external diameter 450 mm is needed to transmit power at 120 rpm. Find out the power it may tran
Note on scale and sludge?
What is tracing error? Define how to track tracing error?
Q. What do you mean by Bunds and Dikes ? A bund (or dike) is an embankment or wall of brick, stone, concrete or other impervious material, which surrounds the entire perimeter
Construct a plain scale: The distance between Indore and Bhopal is 180 kilometer. It is represented on the map via 9 centimeter. Construct a plain scale for such map, illustra
explain the operation manual of a hydraulic jack
SUBMERGED ARC WELDING-Set Up Submerged arc welding system consists of the following basic modules: 1. Welding head 2. Power source 3. Flux feeding and recovery units Schematic
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd