Example of production rate, Mechanical Engineering

Assignment Help:

Example of Production Rate

The turret lathe section contains six machines, all devoted to the production of the similar part. The section operates 10 shifts/wk. The number of hours per shift averages 8.0. Average production rate of each machine is 17 unit/hr. Calculate the weekly production capacity of the turret lathe section.

Solution

Given  Number of machines n = 6

Number of shifts per week S = 10

Number of hours per shift H = 8

Production rate Rp = 17

Production capacity = n x S x H x Rp

∴ PC = 6 (10) (8.0) (17) = 8160 output unit/wk


Related Discussions:- Example of production rate

Determine the point of contraflexure - overhanging beam, Determine the poin...

Determine the point of contraflexure: Draw the shear force & bending moment diagram for 10 m span overhanging beam along overhanging part of 4 m subjected to a system of loads

Concept of plane stress, Concept of plane stress: Define the concept ...

Concept of plane stress: Define the concept of plane stress. Sol.:   In cubical element of strained material is acted on by stresses acting on only 2 pairs of parallel plane

Furances, type of furances and disadvantage advantage

type of furances and disadvantage advantage

Program evaluation and review techniques, Program Evaluation and Review Tec...

Program Evaluation and Review Techniques: The Rola and Cola Corporation is a professional II nursing home aspiring to become I nursing home. It desires to provide the ultimate

Importance of stresses in shaft, Importance of stresses in shaft: Wha...

Importance of stresses in shaft: What is  importance of stresses in shaft ? Sol.: In shaft the following significant stresses occur. 1. A maximum shear stress occurs on

Assignment, A cantilever beam is loaded with a concentrated. Force of 5kN a...

A cantilever beam is loaded with a concentrated. Force of 5kN at the free end. The length of the cantilever beam is 1m having cross section of 50×50mm. determine the equation for b

Spot welding of different metals-aluminium and its alloys, Spot welding of ...

Spot welding of different metals-Aluminium and its alloys High currents and shorter welding times are necessary for these materials. Special cleaning of the surface is warrante

Short life cycle demand uncertainty - risk management, how I can formulate ...

how I can formulate mathematically the risk management in demand uncertainty of short life cycle product.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd