Example of Production Rate

The turret lathe section contains six machines, all devoted to the production of the similar part. The section operates 10 shifts/wk. The number of hours per shift averages 8.0. Average production rate of each machine is 17 unit/hr. Calculate the weekly production capacity of the turret lathe section.

Solution

Given  Number of machines n = 6

Number of shifts per week S = 10

Number of hours per shift H = 8

Production rate Rp = 17

Production capacity = n x S x H x Rp

∴ PC = 6 (10) (8.0) (17) = 8160 output unit/wk


Related Discussions:- Example of production rate

Force, System of force

System of force

#title.cutting tool life, what is relation between tool life and cutting sp...

what is relation between tool life and cutting speed?

Newton''s first law of motion - mechanics, Newton's first law of motion: ...

Newton's first law of motion: First law of Newton: It is magnitude of force that develops acceleration of 1 m/s2 in 1 kg mass of the body. The subject of rigid body mecha

Calculate force transmitted by the man on the floor of lift, Calculate forc...

Calculate force transmitted by the man on the floor of lift: A vertical lift having total mass 500Kg acquires an upward velocity of 2m/sec over a distance of 3m of motion w

Stress analysis, what is the importance of stress analysis in steels

what is the importance of stress analysis in steels

Thermodynamics, show that energy of an isolated system is conserved

show that energy of an isolated system is conserved

Define the disadvantages of abrasive jet cutting machines, Define the Disad...

Define the Disadvantages of Abrasive Jet Cutting Machines Slow material removal rate. Stray cutting and hence accuracy is not good. Abrasive powder cannot be reused

Calculate transmitted force, A machine having a mass of 100 Kg and supporte...

A machine having a mass of 100 Kg and supported on springs of total stiffness 7.84 x 105 n/m has an unbalanced rotating element which results in a disturbing force of 400 N at a sp

Show the design of the control rooms, Q. Show the design of the control roo...

Q. Show the design of the control rooms? The design of the control rooms in any plant is very important. The control room operator(s) must be able to control and manage safety

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd