Example of Production Rate
The turret lathe section contains six machines, all devoted to the production of the similar part. The section operates 10 shifts/wk. The number of hours per shift averages 8.0. Average production rate of each machine is 17 unit/hr. Calculate the weekly production capacity of the turret lathe section.
Solution
Given Number of machines n = 6
Number of shifts per week S = 10
Number of hours per shift H = 8
Production rate Rp = 17
Production capacity = n x S x H x Rp
∴ PC = 6 (10) (8.0) (17) = 8160 output unit/wk
Objectives After studying this section, you should be capable to: known properties that are essential to be present in a material for high temperature applications,
How to describe sensitivity of Governors
State of motion of body change with force: A body on contact with the surface is being pulled along it with the increasing force from zero. How does the state of motion of bo
Stainless Steel Electrodes A variety of stainless steel electrodes are now being manufactured to produce weld metal similar to composition of most base metals. However, the analy
Q. Steam Generator Piping? Control valves shall be Fisher or Purchaser-approved equal. All valves shall be detailed by size, rating, make, model number, and materials Two
Points of Contraflexure: Assume M 1 , M 2 , . . . and M 6 be the points of contraflexure, where bending moment changes sign. To determine the position of M 2 , let a section
Find velocity of the vehicle: A car having mass 400kg is moving with velocity of 20m/sec. A force of 200N that acts on it for 2 mins. Find velocity of the vehicle: (1) W
Roller conveyors are flat circular or spiral. They consist of rollers supported in frames over which materials are allowed to move. They are driven through gravity. Genera
Forecasting: Forecasts play a vital role in determining material needs that constitute inventories and in establishing production plans. In this unit, you have studied the imp
Determine maximum mechanical advantage: For a lifting machine 15 N effort is needed to raise a load of 70 N with an efficiency equal to 60%, and 25 N effort is needed to lift
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd