The turret lathe section contains six machines, all devoted to the production of the similar part. The section operates 10 shifts/wk. The number of hours per shift averages 8.0. Average production rate of each machine is 17 unit/hr. Calculate the weekly production capacity of the turret lathe section.

Solution

Given  Number of machines n = 6

Number of shifts per week S = 10

Number of hours per shift H = 8

Production rate Rp = 17

Production capacity = n x S x H x Rp

∴ PC = 6 (10) (8.0) (17) = 8160 output unit/wk


Related Discussions:- Example of production rate

Evaluate elongation because of self weight of tapering rod, Determine elong...

Determine elongation because of self weight of tapering rod: Sol.: Take a tapering rod hung vertically and firmly fixed at top position. The rod is of length L tapers unifor

ENGINEERNING DRAWNING, HOW TO PREPARE A DRAWING IN FIRST ANGLE PROJECTION A...

HOW TO PREPARE A DRAWING IN FIRST ANGLE PROJECTION AND THIRD ANGLE PROJECTION AND WHAT IS THEIR BASIC PRINCIPLE AND WE DO NOT MAKE DRAWING IN 2ND ANGLE PROJECTION AND 4TH ANGLE PRO

What is the problem in paving material distribution system, What is the pro...

What is the problem in Paving material distribution system James H. Bassett found the problem in Paving material distribution system In particular, separation of the larger agg

Explain roughness width and roughness width cut off, Explain Roughness widt...

Explain Roughness width and Roughness width cut off? Roughness width: - Roughness width is the distance parallel to the normal surface between successive peaks or ridges whic

Draw body centred cubic structure, Draw BCC structure and determine its num...

Draw BCC structure and determine its number of atoms per unit cell, co-ordination number and highest edgeradius relation. Draw FCC structure and determine its number of atoms pe

Cylinder bore-engine terminology , Cylinder Bore: The nominal inner diame...

Cylinder Bore: The nominal inner diameter of the working cylinder is called the cylinder bore and is designated by the letter D and is usually expressed in millimetre (mm).

Mig / co2 welding, MIG / CO 2 WELDING In MIG / CO 2 welding the feed...

MIG / CO 2 WELDING In MIG / CO 2 welding the feeding of filler wire is machanised. If the welder moves the MIG / CO 2 torch the process is called semi automatic MIG / CO 2

Kinematics and dynamics of Machines, Please help me with this question if y...

Please help me with this question if you are 100 % sure that you will assure me a perfect grade. Please let me know as soon as possible. I need the solution within 18 hours from no

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd