Example of Production Rate
The turret lathe section contains six machines, all devoted to the production of the similar part. The section operates 10 shifts/wk. The number of hours per shift averages 8.0. Average production rate of each machine is 17 unit/hr. Calculate the weekly production capacity of the turret lathe section.
Solution
Given Number of machines n = 6
Number of shifts per week S = 10
Number of hours per shift H = 8
Production rate Rp = 17
Production capacity = n x S x H x Rp
∴ PC = 6 (10) (8.0) (17) = 8160 output unit/wk
Y ield stress and ultimate stress Yield stress: Yield stress can be defined as lowest stress at which extension of test piece increases without increase in the load. It is
derive an expression for range along iclined palne
procedure to find resultant of several forces acting at a point
dimensionless
what is surging ?
what is cone friction?
Imperfect Frame - truss: Imperfec t Frame An Imperfect frame is one that does not satisfies relation between numbers of members and number of joints given by equation
Derive the mathematical expression for heat transfer and temperature distribution through infinite long fin?
Find out the intensity of the external pressure: A thick cylinder of 0.5 m external diameter & 0.4 m internal diameter is subjected simultaneously to internal & external press
difference between stress intensity factor and stress concentration factor
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd