The turret lathe section contains six machines, all devoted to the production of the similar part. The section operates 10 shifts/wk. The number of hours per shift averages 8.0. Average production rate of each machine is 17 unit/hr. Calculate the weekly production capacity of the turret lathe section.
Solution
Given Number of machines n = 6
Number of shifts per week S = 10
Number of hours per shift H = 8
Production rate Rp = 17
Production capacity = n x S x H x Rp
∴ PC = 6 (10) (8.0) (17) = 8160 output unit/wk
Evaluate stress in fibre: Example, the matrix material can be stressed to its full strength of 80 MPa, calculate the allowable % of broken fibres. What will be the stress in f
Evaluate the magnitude, direction and position of the resultant of the system of forces (using vector method) shown in figure below.
what are the di #Minimum 100 words accepted#
Creep: Creep of rails is the forward movement of rails in the direction of dominant traffic over a period of time. Creep is undesirable because it disturbs the gauge of the t
Q. In every electromagnetic conversion device, both generator and motor action take place simultaneously. Explain. The case the output is mechanical as in a motoring mode, th
Design for a water treatment plant: Produce as individuals a single tab Excel spreadsheet which shows a rough initial design for a water treatment plant taking 15
compression ignition engine fore stork with neat daysgram
Example of Manufacturing Lead Time (MLT) A certain part is generated in a batch size of 100 units. The batch should be routed through five operations to complete the processin
Objectives After studying this section, you should be familiarized about: The typical job shop scheduling problem, Characteristics of computer controlled scheduling,
Q. What do you mean by Alloys? Metallic materials that contain alloying elements, including chromium (Cr), cobalt (Co), Columbium or niobium (Cb or Nb), copper (Cu), iron (Fe),
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd