precast pile, Civil Engineering

Assignment Help:
when a precast pile is single point lifting and when double point lifting- what are the moment coefficient of them?

Related Discussions:- precast pile

Standard mixes of concrete, In some nations such as Britain, specification ...

In some nations such as Britain, specification for concrete doesn'tusually require cube tests for standard mixes of concrete. Quality control of standard mixes in Britain is achiev

Joint continuity influenced by inclined bridge deck, Q. Joint continuity in...

Q. Joint continuity influenced by inclined bridge deck? Bearings are generally designed to sit in a horizontal plane so as to avoid the effect of extra horizontal force and une

Main functions of slip joints in block work seawalls, Question What are...

Question What are main functions of slip joints in block work seawalls ? Answer Slip joints are joints that are formed during a complete vertical plane from cope

Calculate the invert elevation of the sewer pipe, 1. The center line elevat...

1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft.   The existing ground top of cut elevation (ft) is most nearly: 2. A design engineer c

Delay of bituminous laying on top of sub-base, Question In case if ther...

Question In case if there is a delay of bituminous laying on top of sub-base, have to tack coat be applied on the top surface of sub-base? Answer When there is a d

Mechanics problem, i am facing some problem in solving the problem of elong...

i am facing some problem in solving the problem of elongation due to self weight suspended from fixed support in the conical bar

Explain the inventory inspections - inspection of bridge, Explain the Inven...

Explain the Inventory inspections - Inspection of Bridge? These inspections are normally performed following new construction, modifications, or repair to establish as-built or

Define the finish to finish activity, A finish-to-finish activity is best d...

A finish-to-finish activity is best described as: The "from" activity must finish before the "to" activity can finish The "from" activity must finish before the "to" acti

Draw sketch for track in a cutting on a mainline route, Q. Draw a neat dim...

Q. Draw a neat dimensioned cross-sectional sketches of a - i. New single Line B.G. track in a cutting on a mainline route. ii. New double Line B. G. track on a trunk route ha

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd