Planning stage of the audit, Civil Engineering

Materiality is used only at the planning stage of the audit.

Ans: I disagree with the statement because:

When planning the audit, the auditor considers what would make the financial information materially misstated. The auditor's assessment of materiality and audit risk is used not only at audit planning stage rather it is also applied at evaluating the results of the audit procedures.

Posted Date: 3/16/2013 3:42:02 AM | Location : United States







Related Discussions:- Planning stage of the audit, Assignment Help, Ask Question on Planning stage of the audit, Get Answer, Expert's Help, Planning stage of the audit Discussions

Write discussion on Planning stage of the audit
Your posts are moderated
Related Questions
Derive the relation among void ratio (e), specific gravity of particles (G) and moisture content at full saturation (w). A certain sample of saturated soil in a container weighs

how to use an autocad

Determine about the statement - Failure at Cracking Load This brittle mode of failure is likely to occur in those pre-stressed elements that are concentrically pre-stressed wit

what is the theary of reduced levelling

Explain the Critical Depth d c is the depth of flow in an open channel that has the lowest energy.  In rectangular open channels:  (d c ) 3 = Q 2 /g(w) 2 In nonrectang

how it different from hot mix asphalt . is it changes any performance compared to hot mix asphalt

Q. Calculation of crack widths arising from thermal movement In the calculation of thermal movement, the below formula is used in most codes: w max =s x a x (T 1 +T 2 )/2

write a c program To compute interior angles and correct them for observational errors and adjusting the bearing of remaining sides when the bearings taken on a closed compass trav

HOW TO FIND OUT 10% FINENESS OF SAND

Q. Explain about Vierendeel girder? Vierendeel girder design is sometimes adopted in design of footbridges. Traditionally truss design, triangular shape of truss is generally u