Planning stage of the audit, Civil Engineering

Materiality is used only at the planning stage of the audit.

Ans: I disagree with the statement because:

When planning the audit, the auditor considers what would make the financial information materially misstated. The auditor's assessment of materiality and audit risk is used not only at audit planning stage rather it is also applied at evaluating the results of the audit procedures.

Posted Date: 3/16/2013 3:42:02 AM | Location : United States







Related Discussions:- Planning stage of the audit, Assignment Help, Ask Question on Planning stage of the audit, Get Answer, Expert's Help, Planning stage of the audit Discussions

Write discussion on Planning stage of the audit
Your posts are moderated
Related Questions
Purpose of carrying out water absorption test for precast concrete pipes Cement will mix with more water than is essential to ultimately combine during hydration of cement pas

Purpose of embedding puddle flange inside the walls of closed valve chambers When valves are closed to stop water flow in a pipeline, a thrust is produced along the direction o

Define the Cost of shock transmission unit? There is a keen competition among the few STU manufacturers. For the second Bassein Creek Bridge, the average cost of two STUs of ca

types of truss of 15 m cantilever with 1000 kg on free end. May be steel or any lightest material aluminium anodized truss. thanks

A retaining wall 12 metres high is proposed to hold sand. The values of void ratio and φ in the loose state are 0.63 and 30° whereas they are 0.42 and 40° in the dense state. Suppo

A pile is driven in uniform clay of large depth. The clay has unconfined compression strength of 90 kN/m 2 . The pile is 30 cm diameter and 6 m long. Verify the safe frictional res


Exponential distribution - Poisson distribution function: Let X follow exponential distribution with parameter θ. Find the pdf of Y = X 1/β where  β( ≥ 1 ) is a constant.

The stresses acting on the plane of maximum shearing stress by a given point in sand are as follows: total normal stress = 250 kN/m 2 ; pore-water pressure = 88.5 kN/ m 2 ; shearin

Q. Estimation of design flood discharge? These methods are also in vogue for estimating maximum discharge. Discharge estimated using the above three methods may be compared wit