Planning stage of the audit, Civil Engineering

Materiality is used only at the planning stage of the audit.

Ans: I disagree with the statement because:

When planning the audit, the auditor considers what would make the financial information materially misstated. The auditor's assessment of materiality and audit risk is used not only at audit planning stage rather it is also applied at evaluating the results of the audit procedures.

Posted Date: 3/16/2013 3:42:02 AM | Location : United States







Related Discussions:- Planning stage of the audit, Assignment Help, Ask Question on Planning stage of the audit, Get Answer, Expert's Help, Planning stage of the audit Discussions

Write discussion on Planning stage of the audit
Your posts are moderated
Related Questions

what are the 2 principle factors affecting the allowable bearing pressure in the design of a specific footing


Q. Lifting hoops in precast concrete - mild steel vs. high yield steel Strength of high yield steel is undoubtedly higher than mild steel and therefore high yield steel is gen

STONE Stone is a 'naturally available building material' used from the early age of civilization. It is available in the form of rocks, which is cut to needed size and shape an

Sieve Analysis - Soil Mechanics and Foundations a. Sieve Analysis used to obtain the grain size distribution of coarse-grained soils (sands and gravels) larger than 0.075 mm (r

Calculate the Amount of Import or Export For the project site shown in Figure, the amount of import or export to bring the entire site to elevation 90-ft is most nearly:

what is the difference between bitumin and asphalt

These days in Portugal is really difficult to get a job. So my question, is there any company that have online jobs in designing and calculating structures?

Test on specially moulded test piece The test piece shall be moulded by the manufacturer with identical compound and under identical vulcanizing conditions as used in manufact