Planning stage of the audit, Civil Engineering

Materiality is used only at the planning stage of the audit.

Ans: I disagree with the statement because:

When planning the audit, the auditor considers what would make the financial information materially misstated. The auditor's assessment of materiality and audit risk is used not only at audit planning stage rather it is also applied at evaluating the results of the audit procedures.

Posted Date: 3/16/2013 3:42:02 AM | Location : United States

Related Discussions:- Planning stage of the audit, Assignment Help, Ask Question on Planning stage of the audit, Get Answer, Expert's Help, Planning stage of the audit Discussions

Write discussion on Planning stage of the audit
Your posts are moderated
Related Questions
What''re the procedures of contouring by graphical interpolation

calculate height of instrument?

Using Matlab/ Simulink software to model the overall building fabric heat transmit characteristics, in order to estimate the maximum rate of heat loss (kW) from the building under

Permissible Stresses in Steel As per the Indian code, the permissible stresses in the tendons at the time of initial prestressing should not exceed 80% of the characteristic t

Question It should be necessary that raking piles of a bridge abutment be placed under an embankment ? Answer For a bridge abutment to be supported on raking piles with div

workability agents

HIGHWAY TRANSPORTATION: Broadly, there are two classes of roads: (a)        Urban, and (b)       Rural (Non-urban). Urban roads are those which are located within tow

hi contactme 9902142308

Q. Reasons for blockage in pumping concrete ? Concrete pumping is normally adopted in highly elevated locations for which access for concrete trucks is difficult. Construction