Pavement layers and their functions, Civil Engineering

Pavement Layers And Their Functions

Flexible Pavement

A typical modern flexible pavement for high traffic is composed of layers as under (Figure).

949_Pavement Layers and Their Functions.png

Figure: Layers in a Flexible Pavement

The function of the layers are:

1095_Pavement Layers and Their Functions1.png

Posted Date: 1/22/2013 4:28:00 AM | Location : United States







Related Discussions:- Pavement layers and their functions, Assignment Help, Ask Question on Pavement layers and their functions, Get Answer, Expert's Help, Pavement layers and their functions Discussions

Write discussion on Pavement layers and their functions
Your posts are moderated
Related Questions
Question What is key function of packing resources in joint of concrete pipes in pipe jacking ? Answer Packing resources are about 10 to 20mm broad and are usually mad

I have to draw the IL for the shear at a roller support and am not sure how it should look

THE DESIGN PERIOD AVERAGE DAILY DEMAND CALCULATE. THE DESIGN DEMAND FOR THE WATER RETICULATION OR DISTRIBUTION PERIOD.

dowel or aggregate interlock ?how to decide?

Question Advantages of casings for mini-piles ? Answer Left-in casings for mini-piles have next advantages as follows- (i) recover resistance to corrosion of ma

Q. How to set Location of the bridge? A bridge is normally located where the river section has minimum width so that the structure becomes shorter and economical. As far as pos

If y1 and y2 are alternate depths of a rectangular channel show that Yc³ =2y1²y2²/(y1+y2) Also specific energy E = y1²+y1y2+y2²/(y1+y2)

Determine about the Hard-drawn steel wires Hard-drawn steel wires which are indented or crimped are preferred for pre-tensioned members as their bond characteristics are superi

Explain the Rippl Diagram or Mass Diagram For a potable water reservoir, it is the simultaneous plots of the cumulative inflow and cumulative water consumption/demand, termed "

Physical Tests on Cement (a) Soundness Test: by sieve analysis, it is conducted. 100 gms of cement is taken and sieved throughout IS sieve No. 9 for fifteen minutes. Residue on