Number of segments for segmental linings in tunnelling, Civil Engineering

Assignment Help:

Q. Number of segments for segmental linings in tunnelling?

For the construction of tunnels by segmental linings, choice of the number of segments affects the durability and cost of tunnels. With an increase in the number of segments, number of joints also increases accordingly. This increases the potential for water ingress into the tunnels.  

Though if the number of segments is kept to a minimum, speed of the erection of segments can be increased. Though, it is expected that higher bending moment would be persuaded in the tunnel rings forsmaller number of segments and extra cost is incurred in the provision of additional reinforcement.


Related Discussions:- Number of segments for segmental linings in tunnelling

Statics - SFD & BMD Calculations, Could someone please help me with the cal...

Could someone please help me with the calculations of determining the sfd & bmd for cantilevers with udl''s, lvl''s and point loads? Also could I please have the same for ssb with

Discuss about the term - end zone, Discuss about the term - End Zone It...

Discuss about the term - End Zone It is the length of a post-tensioned concrete member, at the end, which is required to get a distribution of prestress over the whole of the c

Roads construction in marshy land, precaution to be taken for roads constru...

precaution to be taken for roads construction in marshy land

Define alum (aluminum sulfate) caogulation, Define Alum (aluminum sulfate) ...

Define Alum (aluminum sulfate) Caogulation Purchased as dry or liquid alum { Al 2 (SO 4 ) 3 ,14 H 2 O}, MW 594 (other formulas with varying number of water molecules also u

Deflection of beams, 1) A propped cantilever beam ABC is 7m long.It has th...

1) A propped cantilever beam ABC is 7m long.It has the point C fixed and Point A on a roller support.It carries a 200Kn point load at a distance 3m from A.There is a moment of 80KN

Determine about the prestressed concrete, Determine about the prestressed c...

Determine about the prestressed concrete In prestressed concrete the most important parameter is the prestressing force. Ifthe prestressing force reduces with time, prestresses

Torsion, assumptions made in the simple torsion theory

assumptions made in the simple torsion theory

What is the degree of consolidation, A saturated clay specimen is subjected...

A saturated clay specimen is subjected to a pressure of 240 kN/m 2 . After the lapse of a time, it is determined that the pore pressure in the specimen is 72 kN/m 2 .  What is t

science and materials, the behaviour of structural materials using compara...

the behaviour of structural materials using comparative statement when they are formed into structural member

Digit of cells for concrete box girder bridges, Question How does an engine...

Question How does an engineer determine digit of cells for concrete box girder bridges ? Answer If depth of a box girder bridge exceeds 1/6 or 1/5 of bridge width, then it is o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd