Q. Number of segments for segmental linings in tunnelling?
For the construction of tunnels by segmental linings, choice of the number of segments affects the durability and cost of tunnels. With an increase in the number of segments, number of joints also increases accordingly. This increases the potential for water ingress into the tunnels.
Though if the number of segments is kept to a minimum, speed of the erection of segments can be increased. Though, it is expected that higher bending moment would be persuaded in the tunnel rings forsmaller number of segments and extra cost is incurred in the provision of additional reinforcement.
Cost-volume relationship: Cost-volume relationship is illustrated through a simple example dealing with the cost of operating an automobile. To perform the analysis following
how to calibrate AGGREGATE IMPACT VALUE TESTING MACHINE
what is coursed rubble masonry
Define Project Scheduling - Types of Methods Project Scheduling - Distinction between the Major Types of Schedule Diagrams Precedence Diagrams (PDM) a) Activ
Attached information shows construction details of a water tank. The slab was poured in one pour and the walls (incl. Baffles) were poured in two even sections. Forms were stripped
Explain Flow Measurement with Weirs Fixed plates positioned vertically in an open channel over which flow is directed through an opening. The opening linear distance is termed
Q. How to design Shape of guide bunds? Alignment of guide bunds converging on the upstream was considered by Bell, Spring and Gales to allow for the waterway obstructed by pier
DESCRIBE ON THE TOPIK OF VULCANIZATION
Question What is meaning of washers while using bolts? Answer Purpose of installing washers in a classic bolting system is to distribute loads under bolt heads and nu
When a dam is to be built, a diversion tunnel is usually bored by solid rock next to the dam site to bypass the dam construction site. The dam is built while the river flows by the
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd